6. Engine Removal;Inspection & Installation
6-43
7.4 The right of the bearing inspection
1.
Use hand turn sluggish, bearing whether
card bearing radial clearance is too large,
if have, replace bearing.
2.
6001 Bearing radial clearance standards
0.011-0.025 mm
3.
6304 Bearing radial clearance standards
0.013-0.028 mm
7.5 Right crankshaft case check up
1.
the diameter standard
:∮
72.000-72.025 mm
2.
the Maximum diameter
:∮
72. 080 mm
6
Содержание 500ATV
Страница 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Страница 16: ...1 SERVICE INFORMATION 1 14 ...
Страница 17: ...1 SERVICE INFORMATION 1 15 1 ...
Страница 18: ...1 SERVICE INFORMATION 1 16 ...
Страница 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Страница 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Страница 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Страница 71: ......
Страница 72: ......
Страница 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Страница 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Страница 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Страница 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Страница 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...