6. Engine Removal;Inspection & Installation
6-40
6.
The removal decomposition around check
According to the list of instructions on the order.
1 Hexagon flange bolts M6*85
5 Hexagon flange bolts M8*90
2 Hexagon flange bolts M6*95 6
Right
case
components
3 Hexagon flange bolts M6*105
7 Left the components
4 Hexagon flange bolts M10*78
6.1 As shown on the right engine decomposition bolt
Содержание 500ATV
Страница 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Страница 16: ...1 SERVICE INFORMATION 1 14 ...
Страница 17: ...1 SERVICE INFORMATION 1 15 1 ...
Страница 18: ...1 SERVICE INFORMATION 1 16 ...
Страница 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Страница 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Страница 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Страница 71: ......
Страница 72: ......
Страница 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Страница 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Страница 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Страница 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Страница 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...