O p e r a t i n g I n s t r u c t i o n s
|
KBL Tower pureEnergy 5.0
35
DISCONNECT MAINS VOLTAGE
DANGER
Live parts
Risk of death or fatal injury due to electric
shock when touching live parts.
• Switch neutral
• Secure against reconnection
• Check for neutrality
• Ground and short-circuit
• Cover or shield any adjacent live parts or
components
• Before carrying out any maintenance work, the
tanning device must be disconnected from the
mains voltage. That means that all live cables must
be switched off. Switching off the tanning device
alone is insufficient, as certain points may remain
energized. Therefore, switch off fuses before per-
forming any work and – if possible – remove them.
Additional protective measures
Accidental reactivation may result in serious acci-
dents. After deenergizing, immediately secure all
switches and fuses used for deenergizing against
being switched on again.
• Unscrew circuit breakers.
Where circuit breakers cannot be unscrewed, a strip
of adhesive tape can be applied over the actuation
lever with the wording:
DANGER - DO NOT SWITCH
A sign with the text:
WORK IN PROGRESS
Place: ..............................
Sign may only be removed by: ............................
must always and immediately be securely mounted.
• It is essential that you, the owner, and / or the stu-
dio operator check all components for signs of
wear that can occur during normal use.
• After completing the work, refit all safety devices
(e.g. switches).
10.1 Instructions on cleaning,
disinfection and care
GENERAL INSTRUCTIONS
Before starting to clean the tan-
ning device, take off any rings,
bracelets, watches, etc. that you
might be wearing, in order to
avoid scratching the surfaces of
the tanning device.
Cleaning fluid and/or disinfectant must
not run into the tanning device.
APPLICATION
These symbols have the following meaning.
Apply the cleaning agent
on the chamois or cloth
and not directly on the
surface.
Содержание Tower pureENERGY 5.0
Страница 1: ...OPERATING INSTRUCTIONS TANNING DEVICE ...
Страница 2: ......
Страница 51: ...O p e r a t i n g I n s t r u c t i o n s KBL Tower pureEnergy 5 0 51 Remarks ...
Страница 52: ...O p e r a t i n g I n s t r u c t i o n s KBL Tower pureEnergy 5 0 52 Remarks ...
Страница 53: ...O p e r a t i n g I n s t r u c t i o n s KBL Tower pureEnergy 5 0 53 Remarks ...
Страница 54: ...O p e r a t i n g I n s t r u c t i o n s KBL Tower pureEnergy 5 0 54 Remarks ...
Страница 55: ......
Страница 56: ...Ringstraße 24 26 56307 Dernbach Germany fon 49 0 26 89 94 26 0 fax 49 0 26 89 94 26 66 ...