O p e r a t i n g I n s t r u c t i o n s
|
KBL Tower pureEnergy 5.0
20
5.1 Class I ME equipment
WARNING
Risk of electric shock
To avoid the risk of electric shock, this
equipment must only be connected to a
supply mains with protective earth.
5.2 Overview supply connections
1
2
4
3
5
6
7
1
Mains voltage aquaCool box
2
Audio connection / channel selection
3
aquaCool - air (blue)
4
aquaCool - liquid
5
Connection of external timer (coin-box system)
6
Power supply
7
Data cable Tower/aquaCool-Box
5.3 Connecting the mains voltage
DANGER
Live parts
Risk of death or fatal injury due to electric
shock when touching live parts.
• Switch neutral
• Secure against reconnection
• Check for neutrality
• Ground and short-circuit
• Cover or shield any adjacent live parts or
components
Both the power supply and the related connection
work must comply with national standards and local
regulations. The connection work and replacement
of the power supply cord must only be performed
by qualified, trained and authorized service techni-
cians. The connection to the 3 x 220 V mains must
be protected by maximum over current protection.
For Canada a Class-A ground fault circuit interrupter
(GFCI) has to be used. Further information can be
found in chapter “Technical data”.
CONNECTION REQUIREMENTS
The electrical installation must be equipped with a
freely accessible all-pole disconnecting device in
accordance with the overvoltage category III. (Master
switch with clearly marked on/off settings e.g. “O”
and “I” or additional indicator light). The master
switch shall be fitted externally on the side of the tan-
ning booth, so the operator can access it at any time,
even when the tanning device is in operation. This
means that for full separation each pole must have
a contact gap according to the conditions of the
overvoltage category III. The device shall be capable
of being locked in the off-position and shall comply
with IEC 60447. A supply main switch must not be
5. Connections
Содержание Tower pureENERGY 5.0
Страница 1: ...OPERATING INSTRUCTIONS TANNING DEVICE ...
Страница 2: ......
Страница 51: ...O p e r a t i n g I n s t r u c t i o n s KBL Tower pureEnergy 5 0 51 Remarks ...
Страница 52: ...O p e r a t i n g I n s t r u c t i o n s KBL Tower pureEnergy 5 0 52 Remarks ...
Страница 53: ...O p e r a t i n g I n s t r u c t i o n s KBL Tower pureEnergy 5 0 53 Remarks ...
Страница 54: ...O p e r a t i n g I n s t r u c t i o n s KBL Tower pureEnergy 5 0 54 Remarks ...
Страница 55: ......
Страница 56: ...Ringstraße 24 26 56307 Dernbach Germany fon 49 0 26 89 94 26 0 fax 49 0 26 89 94 26 66 ...