36
TRENCHER OPERATING INSTRUCTIONS
Drive the Loader to the attachment and couple the Attachment
Plate onto the attachment. Raise the Trencher slightly and engage
the locking pins fully. Turn the engine off and push the AUX
Control Lever forwards and backwards to release any hydraulic
line pressure. Clean the hydraulic
fi
ttings (QRCs) and then
connect them to connections A & B (see “Hydraulic Attachment
Connection” section).
Removal procedure is the reverse order of the above. Remember
to always reconnect the attachment hoses into one another to
stop dirt entering the hydraulic system, or
fi
t the dust
caps supplied.
Ensure that the Trencher is securely attached to the Kanga
Loader. Check that the couplings are engaged and check all joints
for leaks. Tighten/repair as required. Inspect the cutting teeth,
ensuring that they are in good condition and
fi
rmly attached.
Chain Tensioning:
The Trencher chain requires 35-45mm of “lift” to have the correct
tension and should be adjust as required. This is achieved by
loosening the 16mm bolt, adjusting the adjustment wedge, and
retightening the bolt.
CAUTION:
Read all safety rules before operating.
See safety chapter in this manual.
CAUTION:
Prior to commencing any digging operations, check with the Local
Authorities and the land owner that there are no buried services (Power, phone, water,
gas, sewage etc) in the vicinity.
Australia ONLY: Phone 1100 “DIAL BEFORE YOU DIG”
Read the Safety instructions in this Manual.
Keep clear of the Trencher at all times (4m minimum).
FITTING A TRENCHER
PRE-OPERATION CHECK
OPERATING INSTRUCTION
SETTING THE TRENCHING
VALVE
Position the Trencher, and activate the AUX lever so that the chain
runs along the top of the boom and returns back towards you on
the underside. Engage the TILT lever so that the boom and chain
arcs down to dig a trench. When the desired depth is achieved,
slowly drive the Kanga Loader backwards along the trench line.
(LH side of the Loader). This is a load-sensing valve, which can be
set to automatically regulate the speed of travel when trenching.
Use the black knob to shut off the valve (turn clockwise). With the
trencher cutting to the required depth start moving backwards
using the drive levers, open the valve (
½
a turn) and this will
regulate the travel speed. Further adjustment of this valve will
vary the cutting speed to suit the conditions and the
operator’s experience.
NOTE: Minor adjustments are required to maintain a straight
line as the Loader will tend to “drift” to the left.
37
BACK HOE OPERATING INSTRUCTIONS
1. Refer to Backhoe Manual for complete installation
instructions.
2. Turn the engine off, move the Aux Lever 3 back and forth to
release hydraulic pressure. Connect the hoses of the Back
Hoe to A & B QRC’s on the right hand side of the loader
when looking from the front of the machine.
3. Ensure the Loaders Main Arm is lowered with the 4 in 1
Bucket
fl
at on the ground, for best results the backhoe works
better if the bucket is full of dirt making the machine slightly
more stable.
PLEASE NOTE: ALWAYS FIT THE DUST CAPS PROVIDED FOR
THE QRC’S TO YOUR ATTACHMENT AND MACHINE WHEN
NOT IN USE TO PREVENT DIRT ENTERING THE SYSTEM
1. Ensure the Back Hoe is securely attached to the Kanga
Loader. Check the couplings are engaged and check all joints
for leaks.
2. Tighten and Repair as required.
3. Inspect the Backhoe bucket teeth and hydraulic hoses and
cylinders are in good condition.
4. Ensure the Backhoe wheels are in the locked position.
1. Ensure Lever 3 is in the neutral Position.
2. Start the Diesel Engine.
3. Adjust engine rpm using Lever 7 which can be adjusted to
suit the operation and hydraulic requirements.
4. Drive the loader into position then lower the loader main arms
to position the bucket onto the ground.
5. While standing on the rear step of the loader pull Lever 3 of
the mini loader towards you, this allows hydraulic power to go
to the Backhoe Valve.
6. Turn around and operate the backhoe as per control details in
the Back Hoe Operators Manual.
CAUTION:
Once the “AUX” lever is engaged, the KANGA Back Hoe attachment is
“Alive”. Any movement of the KANGA Back Hoe control levers will cause the Back Hoe
to move. Ensure that you are ready to operate the machine and have observed all safety
regulations before moving the control levers.
FITTING THE ROTARY HOE
PRE - OPERATION CHECK
OPERATING INSTRUCTIONS:
CAUTION:
Prior to commencing any digging operations, check with the Local
Authorities and the land owner that there are no buried services (Power, phone, water,
gas, sewage etc) in the vicinity.
Australia ONLY: Phone 1100 “DIAL BEFORE YOU DIG”
Read the Safety instructions in this Manual.
Keep clear of the auger at all times (4m minimum).
CAUTION:
Prior to commencing work, read the
Safety Rules of this Kanga Loader Manual
Содержание PW628
Страница 1: ...PW628 DW625 MID RANGE LOADER OPERATORS MANUAL WWW KANGALOADER COM 1300 4 KANGA...
Страница 2: ...2...
Страница 59: ...59 THIS PAGE IS INTENTIONALLY BLANK...
Страница 64: ...64 DIMENSIONS MID RANGE LOADER...
Страница 69: ......