INSTALLATION EN ALCÔVE/ALCOVE INSTALLATION
Step 6 - Finalize Rail Installation
Clean the rail and the top inside fixed panel glass before
reinstalling the rail (fig. 6.1). Pivot the rail back in position
and fix it without applying any pressure with the missing rail
support (fig. 6.2).
Push the rail toward inside and fix the connector with the
two set screws on the top (fig.6.4).
Make sure the rail stays levelled. If necessary, correct it with
the two rail supports (fig. 6.3).
Note : Change the position of the screw inside the wall anchor
bushing if it’s difficult to be levelled. Make sure to unscrew
partially the two rail supports before (fig. 6.5).
Completely screw the rail supports. Using the two Allen keys
provided, guide the rail supports holes set screws to the top
as shown (fig. 6.6).
Étape 6 - Finaliser l’installation du rail
Nettoyer le
rail
et le haut du verre à l’intérieur du
panneau
fixe
avant de réinstaller le
rail
(fig. 6.1). Remettre le
rail
en
place en le pivotant et installer le
support de rail
manquant
sans mettre de pression (fig. 6.2).
Pousser le rail vers l’intérieur
et fixer le connecteur à l’aide
des vis de pression sur le dessus (fig. 6.4).
S’assurer que le
rail
est toujours de niveau. Corriger à l’aide
des deux
supports de rail
si nécessaire (fig.6.3).
Note : Dans l’incapacité d’obtenir le niveau, changer la
position de la vis dans la bague interne du connecteur mural
en prenant soin de dévisser partiellement les supports de rail
au préalable (fig.6.5).
Visser complètement les
supports de rail
. À l’aide des deux
clés hexagonales, orienter le trou des vis de pression des
supports de rail
vers le haut tel qu’illustré (fig. 6.6).
12
Fig. 6.2
Fig. 6.3
ou
or
12 79
ou
or
12 79
Fig. 6.4
99
18
19
20
17
49
Fig. 6.1
Fig. 6.5
Fig. 6.6
ou
or
12 79
Содержание ROLLAX
Страница 28: ...Imprim en Chine Printed in China 102223 RevI...