18
102223 RevI
INSTALLATION EN ALCÔVE/ALCOVE INSTALLATION
Choose the block (left or right) depending on opening
previously choosen (fig.10.1). Insert the block at the bottom
of the fixed panel base. The screw hole should be inside of
the shower
(fig.9.2).
Important: Make sure that the fixed panel is parallel to the
threshold.
Mark the location of the screw (fig.9.2).
For an acrylic shower base, drill a hole of 3mm (3/32’’). Apply
a drop of silicone then screw the guide to the base with a metal
screw quadex M4 25mm (fig.9.3).
For a ceramic shower base, drill a hole of 5mm (7/32’’). Install
the wall anchor, apply a drop of silicone then screw the guide
to the base with a metal screw quadex M4 25mm (fig. 9.4).
Assemble the rest of mobile pannel sliding guide
(fig.9.5).
Choisir le
bloc
(gauche ou droite) qui fixe le
panneau fixe
dépendant du choix de l’ouverture de la porte (fig.9.1). Insérer le
bloc à la base du
panneau fixe
au centre de la douche en prenant
soin de mettre le
guide
du
panneau mobile
vers l’intérieur de
la douche (fig.9.2).
Important : S’assurer que le panneau fixe reste parallèle au seuil.
Marquer l’emplacement de la vis (fig.9.2).
Pour une base d’acrylique, percer un trou de 3mm (3/32’’), y
appliquer une goutte de silicone puis visser le
guide
à la base à
l’aide de la
vis de métal quadrex M4 25mm
(fig.9.3).
Pour une base en céramique, percer un trou de 5mm (7/32’’).
Installer la
cheville d’ancrage
fournie dans le trou, appliquer
une goutte de silicone et visser le
guide
à la base à l’aide de la
vis de métal quadrex M4 25mm
(fig.9.4).
Assembler le reste du guide pour panneau mobile
(fig.9.5).
Fig. 9.5
A
B
47
Ø 5mm
7/32’’
Fig. 9.4
46
Ø 3mm
3/32’’
Fig. 9.3
47
Fig. 9.2
1
Fig. 9.1
Ouv. à gauche /
Le opening
Ouv. à droite /
Right opening
103
102
Step 9 - Mobile Panel Guide Installation
Étape 9 - Installation du guide
du panneau mobile
Содержание ROLLAX
Страница 28: ...Imprim en Chine Printed in China 102223 RevI...