22
6. Turn the stem of the Hi valve about 45°counterclockwise for 6 or 7seconds after the gas coming
out, then tighten the flare nut again. Make sure the pressure display in the pressure indicator is a
little higher than the atmosphere pressure.
7. Remove the charge hose from the Lo pressure charge hose.
8. Fully open the Hi and Lo packed valve.
9. Securely tighten the cap of the packed valve.
Gas leak check
Soap water method
Apply soap water or a liquid neutral detergent on the indoor unit connections or outdoor unit
connections by a soft brush to check for leakage of the connecting points of the piping. If bubbles
come out, the pipes have leakage.
6.5 Pumping down (Re-installation)
Procedure
1. Confirm that both the 2-way and 3-way valves are set to the opened position.
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
2. Operate the unit for 10 to 15 minutes.
3. Stop operation and wait for 3 minutes, then connect the charge set to the service port of the 3-way
valve.
Содержание R ON-OFF series
Страница 1: ...SPLIT WALL MOUNTED TYPE R ON OFF SERIES...
Страница 8: ...6 2 Function...
Страница 11: ...9 3 Dimension 3 1 Indoor Units Figure 1 Figure 2...
Страница 14: ...12 4 Refrigerant Cycle Diagram For heat pump models...
Страница 15: ...13 5 Wiring Diagram 5 1 Indoor Units KSR1 07HRN1 QC2 A KSR1 09HRN1 QC2 A KSR1 18HRN1 QB8...
Страница 16: ...14 KSR1 21HRN1 QB8W KSR1 21CR QB6W KSR1 21HR QB6W KSR1 24HRN1 QB8W...
Страница 17: ...15 5 2 Outdoor Units KOK1 07HN1 QC2 KOA1 09HN1 QC2...
Страница 18: ...16 KOE 18HN1 QB8...
Страница 19: ...17 KOF 21HN1 QB8W K0F2 21C QB6W KOP 21H QB6W...
Страница 20: ...18 KOF2 24HN1 QB8W...