6.
Have one person grasp both sides of the switch, lift the switch, and position it in the rack, aligning
the holes on the side mounting rail with the threaded holes in the front post of the rack. Have the
person align the bottom hole in both the front-mounting brackets with a hole in each rack rail,
making sure that the chassis is level. See
.
Figure 73: Mounting the Switch to the Front Posts in a Rack
7.
Have a second person secure the front of the switch to the rack by using the appropriate screws for
your rack.
8.
Slide the rear-mounting blades into the side mounting-rails. See
Figure 74: Sliding the Rear-Mounting Blades into the Side Mounting Rails
129
Содержание EX4100
Страница 1: ...EX4100 and EX4100 F Switch Hardware Guide Published 2022 11 08 ...
Страница 68: ...Figure 45 Front to Back Airflow Through the EX4100 48P or EX4100 48T Switch Chassis 59 ...
Страница 69: ...Figure 46 Front to Back Airflow Through the EX4100 24MP or EX4100 48MP Switch Chassis 60 ...
Страница 70: ...Figure 47 Front to Back Airflow Through the EX4100 F 24P Switch Chassis 61 ...
Страница 71: ...Figure 48 Front to Back Airflow Through the EX4100 F 24T Switch Chassis 62 ...
Страница 72: ...Figure 49 Front to Back Airflow Through the EX4100 F 48P Switch Chassis 63 ...
Страница 105: ...Figure 62 Clearance Requirements for Airflow and Hardware Maintenance for the EX4100 24MP and EX4100 48MP Switch 96 ...
Страница 106: ...Figure 63 Clearance Requirements for Airflow and Hardware Maintenance for the EX4100 F 24T Switch 97 ...
Страница 107: ...Figure 64 Clearance Requirements for Airflow and Hardware Maintenance for the EX4100 F 24P Switch 98 ...
Страница 108: ...Figure 65 Clearance Requirements for Airflow and Hardware Maintenance for the EX4100 F 48P Switch 99 ...
Страница 209: ...5 CHAPTER Troubleshoot Hardware Troubleshoot the EX4100 and EX4100 F Components 201 ...