21-77
Section 21 Maintenance & Inspection
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
23
24
24
26
27
5
Replace the motor.
Remove the hexagon bolts (M6, at 4
places) and then remove the motor.
Apply grease to the gears of the new
motor, and bolt the new motor.
Tighten the hexagonal bolts using a
torque wrench (72 kgf·cm).
Reverse the order to complete the
procedure.
The rotor of the motor rotates.
Clamp the cable such that it will not
touch the rotor.
Make sure that all bolts and screws
are tightened again, and all cables are
properly re-connected.
Remove the four
bolts.
Содержание JMR-7210-6X
Страница 2: ......
Страница 62: ...Section 19 Adjusting and Setting up Equipment for Services 19 50...
Страница 230: ...Section 22 Failures and After Sale Services 22 52...
Страница 286: ......
Страница 304: ......
Страница 426: ...Appendix D Menu List and Materials D 34 D 1 16 Code Input Password ECDIS RADAR CONNING...
Страница 498: ...Appendix D Menu List and Materials D 106 Object name Icon button display example Remarks Weed Kelp Wreck...
Страница 546: ...Appendix D Menu List and Materials D 154 No Drawn object name Drawn object display example 8 Plotted Position...
Страница 585: ......