JOHNSON CONTROLS
11
FORM 155.17-N1
ISSUE DATE: 4/1/2013
1
The installing contractor is ad vised to become thor-
ough ly fa mil iar with the installation, op er a tion, main-
te nance and ser vice re quire ments of the YORK Para-
Flow™ chill er. Careful study of the fac to ry submittal
drawings and this document is highly rec om mend ed.
Johnson Controls rep re sen ta tives are available to an-
swer any and all questions and to coordinate de liv ery
of the unit and its ac ces so ries.
The local Johnson Controls office must be advised by
the con trac tor of the scheduled start-up time so that
qual i fied per son nel can be made available for that
date. Johnson Controls re quires a minimum of four
weeks advance notice to schedule a unit start-up and
to have the lithium bromide solution delivered to the
jobsite. To help facilitate this action, at the end of this
document is an Installation Check List and Request for
Authorized Start-up Engineer. Please take the time to
properly fill it out at the completion of the installation
and send (or give) it to the local Johnson Controls of-
fice so that a unit start-up can be sched uled.
SITE SELECTION
The ParaFlow™ Chiller/Heater operating weight
should be considered when choosing the unit location.
In selecting a site, consider structural support, access
for service and tube pull area on either end of the main
shell. Tube pull space is approximately equal to the
length of the main shell.
If the chiller is a direct-fired unit, con sid er ation should
be giv en to the stack in comparison to building intake
and exhaust vents, cooling towers, etc. The effect of
wind patterns around a building can create surface
pres sures and eddy currents that could lead to draft
problems or contamination of other systems.
Follow standard engineering practice in designing the
piping systems and other services.
Adequate support must be provided for
system piping so that no weight is placed
on the unit's water boxes and connecting
nozzles.
This manual provides the installing contractor with all
the necessary information to do the following:
1.
Define the scope of his work.
2. Accurately estimate the cost of his work.
3. Assure proper, timely and trouble-free unit in stal-
la tion.
4. Assure satisfactory unit performance after in stal-
la tion.
5. Assure overall customer satisfaction by eliminat-
ing installation delays and unexpected costs.
For answers to any questions regarding unit in stal la-
tion, design, specifications, literature or operation on
the par tic u lar unit you are installing, please contact
your local Johnson Controls of fice.
This installation guide may be used in conjunction
with the following other related YORK publications:
155.17-PA1
- Field control modifications diagram for
Millennium YPC control center.
155.17-PA2
- YPC wiring diagram, field connections
for Millennium control center.
155.17-PA3
- Dimensions and physical data for direct-
fired “G” style units.
155.17-PA4
- Dimensions and physical data for direct-
fired “S” style units.
155.19-PA2
- Dimensions and physical data for steam-
fired “S” style units.
155.19-PA1
- Dimensions and physical data for steam-
fired “G” style units.
155.17-W1
- Elementary wiring diagrams for all di-
rect-fired YORK ParaFlow
TM
ab sorp tion units.
155.19-W1
- Elementary wiring diagrams for all
steam-fired YORK ParaFlow
TM
absorption units.
When using this manual, the in stall er must pay par-
tic u lar at ten tion to the words; DAN GER, WARN ING,
CAU TION and NOTE. These words are accompanied
by sym bols to alert the reader of areas of potential haz-
ard. For further explanation see the Safety Symbols
sec tion at the front of this doc u ment.
SECTION 1 – INTRODUCTION
Содержание YORK YPC Series
Страница 10: ...JOHNSON CONTROLS 10 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 18: ...JOHNSON CONTROLS 18 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 20: ...JOHNSON CONTROLS 20 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 28: ...JOHNSON CONTROLS 28 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 30: ...JOHNSON CONTROLS 30 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 34: ...JOHNSON CONTROLS 34 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 36: ...JOHNSON CONTROLS 36 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 38: ...JOHNSON CONTROLS 38 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 46: ...JOHNSON CONTROLS 46 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 50: ...JOHNSON CONTROLS 50 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 52: ...JOHNSON CONTROLS 52 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 54: ...JOHNSON CONTROLS 54 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 58: ...JOHNSON CONTROLS 58 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 62: ...JOHNSON CONTROLS 62 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 64: ...JOHNSON CONTROLS 64 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 70: ...JOHNSON CONTROLS 70 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 78: ...JOHNSON CONTROLS 78 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 80: ...JOHNSON CONTROLS 80 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 84: ...JOHNSON CONTROLS 84 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 93: ...JOHNSON CONTROLS 93 Appendix A Tables A FORM 155 17 N1 ISSUE DATE 4 1 2013 ...
Страница 94: ...JOHNSON CONTROLS 94 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 98: ...JOHNSON CONTROLS 98 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 113: ...JOHNSON CONTROLS 113 Appendix C Insulation Illustrations C FORM 155 17 N1 ISSUE DATE 4 1 2013 NOTES ...