JOHNSON CONTROLS
23
FORM 155.17-N1
ISSUE DATE: 4/1/2013
6
SECTION 6 – UNIT WATER PIPING AND HOOK-UP
When the assembly of the unit is complete, and unit is
level, the absorber/condenser, chilled, and hot water
(if applicable) piping connections may be made.
As standard, the unit nozzles will be provided with
victaulic connections suitable for 150 PSIG design
wa ter pressure (DWP). Flanged connections for 150
or 300 PSIG DWP are provided only as an option at
time of order.
All unit piping must be installed in accordance with
ac cept ed piping practice and any applicable local pip-
ing codes. Provide adequate temperature and pressure
wells or taps on all supply and return piping.
All water piping must be adequately
supported and braced independent of
the chiller. No strain whatsever is to be
placed on the unit water boxes, nozzle,
and/or connection flanges. Piping should
not spring when connections are broken
at unit.
The piping should be arranged with offsets for flex i-
bil i ty, and adequately supported and braced indepen-
dently of the unit to avoid strain on the unit and vibra-
tion trans mis sion. Hangers must allow for alignment
of pipe. Iso la tors (by others) in the piping are not nec-
es sary but may be desirable, and may be required by
customer spec i fi ca tions.
Upon completion of the unit piping, a connection in
each line as close to the unit as possible should be
opened by re mov ing the flange bolts or coupling and
check for pip ing alignment. If any of the bolts are
bound in their holes, or if the connection between
the pipes spring out of align ment, the pipe has excess
strain on it which could cause dam age to the unit. The
pip ing mis align ment must be cor rect ed by prop er ly
sup port ing the pip ing or by ap ply ing heat to anneal
the pipe.
If the piping is annealed to relieve stress,
the inside of the pipe must be cleaned of
scale before it is finally bolted in place.
FIGURE 8 -
TYPICAL WATER PIPING SCHEMATIC, ALL UNITS - MODELS 12SC THROUGH 22G
ld05302
COOLING TOWER
3-WAY
BYPASS VALVE
TOWER
PUMP
HOT WATER HEATER
CONDENSER
EVAPORATOR
ABSORBER
T
P
T
T
T
T
T
P
P
P
P
P
Содержание YORK YPC Series
Страница 10: ...JOHNSON CONTROLS 10 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 18: ...JOHNSON CONTROLS 18 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 20: ...JOHNSON CONTROLS 20 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 28: ...JOHNSON CONTROLS 28 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 30: ...JOHNSON CONTROLS 30 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 34: ...JOHNSON CONTROLS 34 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 36: ...JOHNSON CONTROLS 36 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 38: ...JOHNSON CONTROLS 38 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 46: ...JOHNSON CONTROLS 46 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 50: ...JOHNSON CONTROLS 50 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 52: ...JOHNSON CONTROLS 52 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 54: ...JOHNSON CONTROLS 54 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 58: ...JOHNSON CONTROLS 58 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 62: ...JOHNSON CONTROLS 62 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 64: ...JOHNSON CONTROLS 64 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 70: ...JOHNSON CONTROLS 70 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 78: ...JOHNSON CONTROLS 78 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 80: ...JOHNSON CONTROLS 80 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 84: ...JOHNSON CONTROLS 84 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 93: ...JOHNSON CONTROLS 93 Appendix A Tables A FORM 155 17 N1 ISSUE DATE 4 1 2013 ...
Страница 94: ...JOHNSON CONTROLS 94 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 98: ...JOHNSON CONTROLS 98 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 113: ...JOHNSON CONTROLS 113 Appendix C Insulation Illustrations C FORM 155 17 N1 ISSUE DATE 4 1 2013 NOTES ...