CONDENSING WARM AIR COMMISSIONING CHECKLIST AND
GUARANTEE
VALIDATION RECORD
Address:
Warm Air Heater make and model:
Warm Air Heater serial number:
Commissioned by (PRINT NAME):
Gas Safe registration number:
Company name:
Telephone number:
Company email:
Company address:
Commissioning date:
Heating and hot water sytems complies with the appropriate Building Regulations?
Yes
Optional: Building Regulations Notification Number (if applicable)
Time, temperature control and boiler interlock provided for central heating and hot water:
Yes
WATER QUALITY (DW Models)
The system has been flushed, cleaned and a suitable inhibitor applied upon final fill, in accordance with BS7593 and the warm air heater manufacturers instructions. Yes
What system cleaner was used?
Brand:
Product:
What inhibitor was used?
Brand:
Product:
Primary water system filter
Pre-existing
Fitted
Not required
CENTRAL HEATING MODE measure and record (as appropriate)
Gas rate (for combination boilers complete DHW mode gas rate)
m³/hr
or
ft³/hr
Central heating output left at factory settings?
Yes
No
If no, what is the maximum central heating output selected?
kW
Dynamic gas inlet pressure
mbar
Central heating flow temperature
°C
Central heating return temperature
°C
System correctly balanced/rebalanced?
Yes
DOMESTIC HOT WATER MODE Measure and record (D
W
Models)
Gas rate
m³/hr
or
ft³/hr
Dynamic gas inlet pressure at maximum rate
mbar
Cold water inlet temperature
°C
Hot water has been checked at all outlets
Yes
Temperature
°C
CONDENSATE DISPOSAL
The condensate drain has been installed in accordance with the manufacturers’ instructions and / or BS5546/BS6798
Yes
Point of termination
Internal
External (only where internal termination impractical)
Method of disposal
Gravity
Pumped
ALL INSTALLATIONS
Record the following
At max rate
CO
ppm CO
2
% CO/CO
2
Ratio
At min rate (where possible)
CO
ppm CO
2
% CO/CO
2
Ratio
Where possible, has the flue integrity check been undertaken in accordance with the manufacturers’ instructions and/or BS5546/BS6798 and are readings correct
Yes
The operation of the heater and system controls have been demonstrated to and understood by the customer
Yes
The manufacturers’ literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Yes
Commissioning Engineeer’s signature
Customer’s signature
(To confirm satisfactory demonstration and receipt of the manufacturers’ literature)
*All installations in England and Wales must be notified to Local Authority Building Control (LABC)
either directly or through a Competent Persons Scheme.
A Building Regulations Compliance
Certificate will then be issued to the customer
Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk