www.johnsonandstarley.co.uk
2
In the interest of continuous development Johnson and Starley reserve the right to change specification without prior notice.
Johnson and Starley prides itself on it’s ability to supply spare parts quickly and efficiently.
PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE
STARTING INSTALLATION. LEAVE THESE INSTRUCTION WITH
THE USER OR AT THE GAS METER AFTER INSTALLATION
The Benchmark Scheme
Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are
provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with
the manufacturer’s instructions by competent persons and that it meets the requirements of the appropriate Building
Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be
provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark Code of
Practice which is available from the Heating and Hotwater Industry Council who manage and promote the Scheme.
Visit www.centralheating.co.uk for more information.
CONTENTS
The Benchmark Scheme
2
1 Features
3
2 General Description
3
3 Building Standards & Regulations
4
4 Safety &Gas Information
4
General Safety Information
Gas Categories
Gas Supply
5 Technical Data
5
6 Heater Compartment Clearances
5
7 Ventilation & Combustion Air
6
8 Duct System
6
Return Air
Warm Air Delivered
9 Flue Instructions
7
Flue Installation
Plume Terminal Positions
Flue Terminal Positions
Resistance Factors
Worked Calculation Factor
Equivalent Flue Lengths
10 Electrical
12
Mains Supply
Thermista-stat & It’s Location
11 Gas
12
12 Fitting Instructions
12
13 Commissioning
13
Preparation
System Balancing
Lighting Ignition & Main Burner
Main Burner Pressure Test
Extinguishing of Pilot & Mains Burners
Temperature Rise Checks
Automatic Controls Check
Safety Check
14 Users Instructions
16
15 Servicing & Maintenance
17
Routine Maintenance
Burner & Control Assembly Removal
Burner & Control Assembly Cleaning
Main Ignition Removal, Cleaning & Replacement
Pilot Burner, Thermocouple & Electrode Removal & Replace-
ment
Muilti Functional Control Removal
Piezo Unit Removal
Air Circulation Fan Removal & Cleaning
Electrical Assembly Removal
Electrical Module Removal
Transformer Removal
Time Control & Switch Removal
Fan Delay Control/Limit Switch Removal
Spillage Monitoring Device (TTB) Removal
Heat Exchanger Access
16 Defect Diagnosis
19
17 Dimensions
21
18 Fault Finding Flowcharts
22
19 Functional Diagrams
24
20 Circuit Diagram
26
21 Short List of Spares
28
22 Exploded Diagram
29
23 Benchmark Checklist and Service Record
30
Содержание 42-451-09
Страница 21: ...21 Sales Spares Replacement Help Line 01604 762881 FIGURE 11 HI SPEC J40 DIMENSIONS 17 DIMENSIONS...
Страница 23: ...23 Sales Spares Replacement Help Line 01604 762881 MAIN BURNER NOT OPERATING...
Страница 24: ...www johnsonandstarley co uk 24 20 DEFECT DIAGNOSIS FLOWCHART FIGURE 12 SYSTEM E T FUNCTIONAL DIAGRAM...
Страница 25: ...25 Sales Spares Replacement Help Line 01604 762881 FIGURE 13 BASIC FUNCTIONAL DIAGRAM...
Страница 26: ...www johnsonandstarley co uk 26 FIGURE 14 SYSTEM E T CONTROL CIRCUIT DIAGRAM 21 LOGIC DIAGRAM...
Страница 27: ...27 Sales Spares Replacement Help Line 01604 762881 FIGURE 15 BASIC CONTROL CIRCUIT DIAGRAM...
Страница 29: ...29 Sales Spares Replacement Help Line 01604 762881 FIGURE 16 HI SPEC J40 EXPLODED DIAGRAM 23 EXPLODED DIAGRAM...