Joerns WeCare Bed Скачать руководство пользователя страница 12

12

Joerns® Bed Frames
WeCare™ Bed

© 2022 Joerns Healthcare • 6110435 RevC • 22-2083

Caution: 

Be careful not to damage power cord when 

moving or placing bed. After placing bed in service, 

monitor power cord positioning carefully to prevent 

damage as you fully operate all bed functions.

Caution:

 When power cord is not plugged into a wall 

outlet, place it on sleep surface to prevent it from 

contacting floor. This will help prevent cord damage 

when transporting bed.

Caution: 

If a power cord is damaged, remove bed 

from service until repairs are performed.

Warning: Possible Injury

. Before leaving the bed 

unattended, check that the casters in the locked 

position. Never leave an unlocked bed unattended. 

Warning: Possible Injury.

 Check that the casters are 

in the locked position before allowing the resident to 

enter or exit the bed. 

Servicing

Service parts list available upon request. The actuators 

and control box contain no serviceable items. 

Pendant P/N: 11016809 

Power Cord Class I P/N: 11016857

Warning: Possible Shock Hazard. 

Unplug 

power cord from wall outlet before performing any 

maintenance or service to control box. 

Warning: Possible high temperature.

 Prior to 

servicing any electrical component ensure the 

component has cooled to room temperature.

Power Cord

Conduct a yearly inspection of power cord to ensure 

efficient bed operation.

1. 

Check power cord to make sure it has not been 

damaged. If power cord needs replacement due to 

damage, remove bed from service until power cord 

has been replaced.

Actuator and Control Box Information

Cable and Port Identification (Figure 29)

1.   Back Actuator (Port 1)

2.  Knee Actuator (Port 2)

3.  Hi-Lo Actuator (Head end - Port 3)

4.  Hi-Lo Actuator (Foot end - Port 4)

H.   Pendant (Port H)

Note: 

The actuators and control box contain no 

serviceable parts. Overload protection is achieved via 

current sensing technology, which will automatically 

reset. If any bed function fails to operate, check to see 

if bed is overloaded or constrained from movement. 

Figure 30

Figure 29

1

2

3

4

H

Power Cord Port

Figure 31

1

2

3

To Remove Control Box

1. 

Plugs and ports are numbered so they can be 

easily reinstalled later (see actuator and control 

box information).

2. 

Remove cable clamp from control box (Figure 30).

3.  Unplug all actuator cables and pendant control 

plug. Remove ground wire screw, if present.

4.  Remove the three fasteners securing the control 

unit to the mounting plate (Figure 31).

5. 

To replace control box, reverse these instructions.

Содержание WeCare Bed

Страница 1: ...User Service Manual Joerns Bed Frames WeCare Bed To avoid injury read user s manual before using...

Страница 2: ...actory installed routing configuration Failure to do so could result in injury or death Warning An optimal bed system assessment should be conducted on each resident patient by a qualified clinician o...

Страница 3: ...lectromagnetic immunity of this equipment and result in improper operation Warning Portable RF communications equipment including peripherals such as antenna cables and external antennas should be use...

Страница 4: ...r of long term care beds and a frontrunner in addressing this critical issue Joerns Healthcare can offer you the expertise assistance and products to bring your facility into compliance Joerns Complia...

Страница 5: ...ondensing Atmospheric Pressure 700 hPa to 1060 hPa Protected Against Splashing Water IPX4 Storage and Shipping Conditions Ambient Temperature 40 C to 70 C Relative Humidity 10 to 100 Atmospheric Press...

Страница 6: ...tting orange zip ties 1 Identify head frame and foot frame by compatible ID labels on left side Figure 1 2 Lay frame halves on soft surface feet side down Place packing material under head frame to ma...

Страница 7: ...and head end hi lo cables and route through safety pin bail Figure 6 then route behind cable bundle Figure 10 and 11 8 Insert back actuator cable in port 1 and insert hi lo actuator head end cable in...

Страница 8: ...ols Required 2 Phillips screwdriver 1 Locate the screws at each corner of the inside tube at the foot end of the screws mattress support platform one per side Figure 16 2 Remove the screws using the 2...

Страница 9: ...will have staff control electronics if staff control was ordered 2 Lay panel on soft surface front face down 3 Foot panel brackets are shorter of two sizes Figure 19 4 Install the foot panel brackets...

Страница 10: ...end 3 Unplug the pendant Route one cable under the control box and plug into pendant port Route the second cable under the control box and connect to the hand pendant Figure 22 4 Route the two cables...

Страница 11: ...art with the bed in the highest position Press Trendelenburg Reverse Trendelenburg button until desired angle is obtained Caution Ensure the bed remains stable and does not roll sideways while in Tren...

Страница 12: ...Possible high temperature Prior to servicing any electrical component ensure the component has cooled to room temperature Power Cord Conduct a yearly inspection of power cord to ensure efficient bed o...

Страница 13: ...ng Always follow proper factory installed routing configuration Be sure to check condition of power cord on a regular basis Do not use damaged or frayed power cords 4 Disconnect the ground wire if pre...

Страница 14: ...of cable Avoid dropping or stretching pendant during use to maximize service life Cleaning Caution Possible damage to electrical parts and or shock hazard Warning Possible Injury or Burns Do not use f...

Страница 15: ...crossing over thresholds may cause it to disconnect from bed resulting in loss of control of bed 4 Take extra care when moving bed remember do not move bed while occupied by resident patient on any sl...

Страница 16: ...loor where they might be stepped on and adversely affected or damaged Exercise particular caution when the bed is moved to its lowest position as items attached to the holder at that height are especi...

Страница 17: ...cations equipment and the Joerns WECC Bed The Joerns WECC bed is intended for use in an electromagnetic environment for professional healthcare in which radiated RF disturbances are controlled The cus...

Страница 18: ...al healthcare environment Surge IEC 61000 4 5 0 5 kV 1 kV line s to line s 0 5 kV 1 kV 2 kV line s to earth 0 5 kV 1 kV line s to line s 0 5 kV 1 kV 2 kV line s to earth Mains power quality should be...

Страница 19: ...MHz 80 MHz 80 AM at 1 kHz 3 V m 80 MHz 2 7 GHz 80 AM at 1 kHz Portable and mobile RF communications equipment should be used no closer to any part of the Joerns WECC bed including cables than the reco...

Страница 20: ...re will void this warranty Parts Joerns beds contain various parts that wear from normal use These parts such as DC batteries are not covered under the one year warranty but are covered for 90 days af...

Отзывы: