3
Figure 2-2 installation orientation
The minimum installation spacing dimensions are shown
below:
Directio
n
Minimum
space
Direction
Minimum
space
Above
100cm
Sides
100cm
Below
100cm
Front
100cm
2.3 Installation of Inverter
Step 1
:
Drill holes in the
selected installation
position with
1200mm for two
holes of Ф8.
Содержание JNP370LS-V1
Страница 1: ...I Quick Installation JNP370LS V1 JNP550LS V1 QI JNP 550LS V1 EN V1 0 Solar pumping inverter ...
Страница 19: ...16 Figure 3 11 detail of water level sensor A Figure 3 10 detail of water level sensor A ...
Страница 32: ...29 automatic ally restart only if recharged hardware damage inverter inside hardware damage ...