18
Step 1: Putting blue ring tool into
the hole of the MC4 totally, as
shown on the picture.
Step 2: it will be taken apart easily.
5 Commissioning
5.1 Verify before Commissioning
PV Arrays
The PV array should be checked before operating the
inverter, and to ensure that the positive and negative
mustn’t be misconnect, otherwise, the damage may be
caused to the inverter. Make sure that the open-circuit
voltage of photovoltaic array doesn’t exceed the required
voltage.
DC Input
Make sure that the DC terminals of the inverter are
connected correctly and maintained consistent with the PV
array.
AC Output
Make sure inverter AC output terminal is properly
connected and phase sequence is properly connected,
and the protection ground of the system is properly
connected to PE.
Содержание JNP370LS-V1
Страница 1: ...I Quick Installation JNP370LS V1 JNP550LS V1 QI JNP 550LS V1 EN V1 0 Solar pumping inverter ...
Страница 19: ...16 Figure 3 11 detail of water level sensor A Figure 3 10 detail of water level sensor A ...
Страница 32: ...29 automatic ally restart only if recharged hardware damage inverter inside hardware damage ...