1. Introduction ............................................................................................................................. 1-2
2.
Installation protocol.....................................................................................................................3
3.
Handover protocol ......................................................................................................................4
4.
General information .....................................................................................................................5
4.1. Installation and inspection of lift ...........................................................................................5
4.2. Hazard instructions ..............................................................................................................5
5.
Master data sheet for lift .............................................................................................................6
5.1. Manufacturer ........................................................................................................................6
5.2. Intended use ........................................................................................................................6
5.3. Construction modifications ..................................................................................................6
5.4. Change of installation location .............................................................................................6
5.5. CE mark/Declaration of Conformity ......................................................................................7
6.
Technical information ..................................................................................................................8
6.1. Technical data ......................................................................................................................8
6.2. Safety equipment .................................................................................................................8
6.3. Data sheets .....................................................................................................................9-10
6.4. Load distribution ................................................................................................................11
6.5. Foundation plan .................................................................................................................12
6.6. Electrical diagram and parts list .........................................................................................13
6.7. Hydraulic diagram and hydraulic parts list ..........................................................................14
7.
Safety regulations .....................................................................................................................15
8.
Operating instructions ...............................................................................................................16
8.1. Raising the vehicle .............................................................................................................17
8.2. Lowering the vehicle ..........................................................................................................17
9.
Behaviour in case of malfunction ..............................................................................................18
9.1. Impacting an obstacle ........................................................................................................19
9.2. Emergency lowering ..........................................................................................................19
10.
Maintenance and care ..............................................................................................................20
10.1. Maintenance schedule for lift .....................................................................................20-21
10.2. Checking of lift stability ...................................................................................................22
10.3. Cleaning the lift ...............................................................................................................22
11.
Safety inspection ......................................................................................................................23
12.
Installation and commissioning .................................................................................................24
12.1. Installation guidelines ......................................................................................................24
12.2. Installation of column extension ......................................................................................25
12.3. Installation and anchoring of lift ......................................................................................26
12.4. Installation of crossbar ....................................................................................................27
12.5. Installation of hydraulic pump .........................................................................................28
12.6. Installation of safety catch ...............................................................................................29
12.7. Installation of covers, pipe clips and hydraulic line ......................................................30-32
12.8. Installation of synchronisation cable ................................................................................33
12.9. Installation of control cabinet ..........................................................................................34
12.10. Installation of limit switch ..............................................................................................35
12.11. Installation of support arm ........................................................................................36-37
12.12. Electrical connection ................................................................................................38-43
12.13. Filling and venting of hydraulic system .....................................................................44-45
12.14. Commissioning ...............................................................................................................45
12.15. Change of installation location ......................................................................................46
12.16. Dowel data sheet MKT SZ-B 18/70 (18M12) ..................................................................47
13.
Non-recurring safety inspection before commissioning ............................................................48
14.
Regular safety inspection and servicing ..............................................................................49-58
15.
Extraordinary safety inspection ................................................................................................59
16.
CE confirmation ........................................................................................................................60
Contents
Содержание FOX 4000 H
Страница 11: ...9 6 3 Data sheets a Standard version with 4090 mm ...
Страница 12: ...10 b Lift column extension version with 4690 mm ...
Страница 13: ...11 6 4 Load distribution ...
Страница 14: ...12 6 5 Foundation plan ...
Страница 15: ...13 6 6 Electrical diagram and parts list ...
Страница 16: ...14 6 7 Hydraulic diagram and hydraulic parts list ...
Страница 32: ...30 12 7 Installation of covers pipe clips and hydraulic line ...
Страница 33: ...31 ...
Страница 34: ...32 Ensure that hydraulic hoses F G and I are firmly connected and no leaks are evident ...
Страница 37: ...35 12 10 Installation of limit switch ...
Страница 41: ...39 B Safety catch A Cable from control cabinet B Safety catch cable ...
Страница 42: ...40 C Shut off bar C Cable from control cabinet D Safety catch cable ...
Страница 43: ...41 D Limit switch A Cable contact for shut off bar B Crossbar C Connector D Cable gland Clamp 102 Clamp 104 ...
Страница 44: ...42 E Pump unit A Limit switch cable B Column extension cable bushing ...
Страница 45: ...43 A Limit switch cable C Cable sleeve Clamp 102 Clamp 111 ...
Страница 46: ...44 12 13 Filling and venting of hydraulic system Grounding Connection 400 V U1 U2 U3 Clamp 200 Clamp 201 ...
Страница 49: ...47 12 16 Dowel data sheet ...
Страница 62: ...60 16 CE Confirmation ...