11. Safety inspection
The safety inspection is necessary to ensure the operational safety of the lifting plant. It must be conducted as
follows:
-
Prior to initial commissioning following installation of the lifting plant.
Use the “Non-recurring safety inspection” form.
-
Following initial commissioning at regular intervals of maximum one year.
Use the “Regular safety inspection” form.
-
Following changes to the construction of the lifting plant.
Use the “Extraordinary inspection” form.
The non-recurring and regular safety inspection must be conducted by a competent person. It
is recommended that servicing be conducted simultaneously.
Changes to the construction (e.g. modification of the carrying capacity or changes to the lifting
height) and significant repairs to supporting parts (e.g. welding work) must be followed in all
cases by an inspection conducted by an expert (extraordinary safety inspection).
This inspection logbook contains forms with a printed inspection schedule for the safety inspection. Please use
the appropriate form, record the conditions of the inspected lift and retain the completely filled-in form in this
inspection logbook.
Содержание FOX 4000 H
Страница 11: ...9 6 3 Data sheets a Standard version with 4090 mm ...
Страница 12: ...10 b Lift column extension version with 4690 mm ...
Страница 13: ...11 6 4 Load distribution ...
Страница 14: ...12 6 5 Foundation plan ...
Страница 15: ...13 6 6 Electrical diagram and parts list ...
Страница 16: ...14 6 7 Hydraulic diagram and hydraulic parts list ...
Страница 32: ...30 12 7 Installation of covers pipe clips and hydraulic line ...
Страница 33: ...31 ...
Страница 34: ...32 Ensure that hydraulic hoses F G and I are firmly connected and no leaks are evident ...
Страница 37: ...35 12 10 Installation of limit switch ...
Страница 41: ...39 B Safety catch A Cable from control cabinet B Safety catch cable ...
Страница 42: ...40 C Shut off bar C Cable from control cabinet D Safety catch cable ...
Страница 43: ...41 D Limit switch A Cable contact for shut off bar B Crossbar C Connector D Cable gland Clamp 102 Clamp 104 ...
Страница 44: ...42 E Pump unit A Limit switch cable B Column extension cable bushing ...
Страница 45: ...43 A Limit switch cable C Cable sleeve Clamp 102 Clamp 111 ...
Страница 46: ...44 12 13 Filling and venting of hydraulic system Grounding Connection 400 V U1 U2 U3 Clamp 200 Clamp 201 ...
Страница 49: ...47 12 16 Dowel data sheet ...
Страница 62: ...60 16 CE Confirmation ...