46
12.15. Change of installation location
Preconditions corresponding to the installation guidelines must be established for a change of installation loca-
tion. Realise the location change according to the following procedure.
-
Raise the lift to approx. 500 mm.
-
Deactivate the main switch.
-
Disconnect the mains power.
-
Loosen and remove all covers.
-
Drain the oil tank.
-
Dismount the support arms. Pull out the pin and remove the support arm.
-
Detach the synchronisation cables at the bottom of the lift carriage in each case and feed the cable back to
the other column
-
Detach the electrical cable to the safety catch on the opposite side.
-
Detach the hydraulic lines between the cylinders. Seal the hydraulic connections with blind plugs if necesary.
-
Detach the crossbar between the two columns.
-
Release the dowel anchoring of the base plates.
-
Transport the lift to the new installation location.
-
Set up the lift in the same manner as for installation and dowel anchoring prior to initial commissioning.
⚠
New dowels must be used. The old dowels are no longer suitable for use!
A competent person must conduct a safety inspection prior to recommissioning (Use the
“Regular safety inspection” form).
Содержание FOX 4000 H
Страница 11: ...9 6 3 Data sheets a Standard version with 4090 mm ...
Страница 12: ...10 b Lift column extension version with 4690 mm ...
Страница 13: ...11 6 4 Load distribution ...
Страница 14: ...12 6 5 Foundation plan ...
Страница 15: ...13 6 6 Electrical diagram and parts list ...
Страница 16: ...14 6 7 Hydraulic diagram and hydraulic parts list ...
Страница 32: ...30 12 7 Installation of covers pipe clips and hydraulic line ...
Страница 33: ...31 ...
Страница 34: ...32 Ensure that hydraulic hoses F G and I are firmly connected and no leaks are evident ...
Страница 37: ...35 12 10 Installation of limit switch ...
Страница 41: ...39 B Safety catch A Cable from control cabinet B Safety catch cable ...
Страница 42: ...40 C Shut off bar C Cable from control cabinet D Safety catch cable ...
Страница 43: ...41 D Limit switch A Cable contact for shut off bar B Crossbar C Connector D Cable gland Clamp 102 Clamp 104 ...
Страница 44: ...42 E Pump unit A Limit switch cable B Column extension cable bushing ...
Страница 45: ...43 A Limit switch cable C Cable sleeve Clamp 102 Clamp 111 ...
Страница 46: ...44 12 13 Filling and venting of hydraulic system Grounding Connection 400 V U1 U2 U3 Clamp 200 Clamp 201 ...
Страница 49: ...47 12 16 Dowel data sheet ...
Страница 62: ...60 16 CE Confirmation ...