INSTALLATION MANUAL
ZPS-
K5.3,
K10.3, K20.3 CLAMPING
MODULE WITH SENSOR MONITORING,
MOUNTING FLANGE
877.426.2504
SUBJECT TO TECHNICAL CHANGES.
JERGENS INC. · PHONE: 216.486.5540 · FAX: 216.481.6193 /553720 / 553721/
2
TABLE OF CONTENTS
0.0 INTRODUCTION
0.1
0.2
0.3
Individual protective equipment .................................................................. 5
0.4
0.5
0.6
0.7
1.
2.
2.1
Structure of the Zero Point System (ZPS) .................................................. 9
2.2
Technical data for inductive sensor .......................................................... 11
2.3
Circuit diagram of the Zero Point System (ZPS) ....................................... 11
2.4
Operation of the Zero Point System (ZPS) ............................................... 11
3.
3.1
3.2
Installation of the mounting flange ............................................................ 14
3.3
Removal of the installation clamping module from the mounting flange...
3.4
4.
Installation of the clamping module in the mounting flange ......................16
4.1
4.2
4.3
Tolerances and clamping nipple arrangement .......................................... 18
5.
PERFORMANCE AND RESTRICTIONS ON USE
5.1
5.2
5.3
6.
6.1
6.2
Safety during maintenance ....................................................................... 21
6.3
6.4
6.5
7.
POSSIBLE PROBLEMS AND HOW TO REMEDY THEM
8.
8.1
8.2
8.3