JCM Part No. 960-000076R_Rev. 1
© 2007, JCM-American Corporation
6 - 2
Section 6
World Bill Acceptor (WBA®-1x/2x -SS & SS2)
Calibration and Testing
2. Figure 6-2 illustrates the WBA’s external
port, DIP Switch locations and their initial
settings. To prepare the WBA for download
set the DIP Switches as follows:
–
Set DIP Switch No. 8 to ON and
–
Set DIP Switches No. 1 through 7 OFF.
3. Supply power to the WBA. The RED
Indicator LED will flash approximately once
every second.
4. Set Dip Switch No. 8 to OFF.
Software Downloading Procedure
Program Installation
The following PC initialization functions are
required prior to running the downloaded software.
1. Create and name a new folder on your PC.
2. Decompress the .ZIP file and save the
expanded file program contents in the file
folder just created.
3. Double-click on the associated file to start
the program (i.e., “ADJ10Win_e.exe” for
WBA-12/13, “ADJ20Win_e.exe” for WBA-
22/23/24/25).
Calibration Procedure
When the WBA-1x Series Adjustment Program
begins, the Figure 6-3
Screen will appear. Before proceeding check that
the software name, type, and version number are
correct related to your particular country’s
currency type.
To end the software installation process at this
point without recalibrating the WBA, press the
“Exit”
Screen Button.
1. Click on the
“Start”
Screen Button and the
Figure 6-4 Screen will appear.
2. Confirm that the Validation Head is properly
installed before proceeding.
3. When the Acceptor Head installation is
verified, click on the
“OK”
Screen
Button and the Figure 6-5 Screen will
appear.
4. Open the Acceptor Head and Insert the
White Calibration Paper (“KS-030” for
WBA-12/13 or “KS-032” for WBA-22/23/
24/25) as shown in Figure 6-6 and illustrated
in Figure 6-7 a respectively.
Figure 6-2
WBA DIP Switch & Port Location
Figure 6-3
Initial Setup Screen
Figure 6-4
Head Installed Confirmation
Figure 6-5
White Paper Calibration Screen