JCM Part No. 960-000076R_Rev. 1
© 2007, JCM-American Corporation
6 - 1
WBA
®
Series
World Bill Acceptor (WBA
®
-1x/2x -SS & SS2)
S e c t i o n 6
6 CALIBRATION AND TESTING
This section provides Flash EPROM Memory
Download Programming, Calibration, and
Performance Testing instructions for the World Bill
Acceptor Series (WBA). This section contains the
following information:
•
Workbench Tool Requirements
•
Software Download Preparation
•
Software Downloading Procedure
•
Programming Instructions
•
Calibration Procedures
•
Performance Tests
Workbench Tool Requirements
The following tools are required to perform a
workbench software download (See Figure 6-1):
•
JCM World Bill Acceptor (WBA)
•
JCM PS15-006 External Power Supply (Part
No. 550-100042) or equivalent
•
PC containing a free COM Port (OS: Windows
2000/XP)
•
The latest WBA Download Program CD
(obtain from your JCM Sales Representative)
•
Black, White and Mag Tool Calibration Paper
(Figure 6-1 lists the specific part number
requirements for your particular unit).
Software Download Preparation
The following instructions describe how to de-
compress and store a downloaded program onto
a personal computer (PC) for eventual installation
into the World Bill Acceptor:
1. Refer to the Figure 6-1 interconnection
diagram to properly connect the power
supply, various cables and wiring harnesses
to the WBA.
Warning: Make sure the External
Power Supply is OFF when connecting
the harness to the WBA. Failure to do
so may cause electrical shock and/or
permanent damage to the equipment.
Figure 6-1
Required WBA Download Workbench Tools