46
Detail A
6.2.2
Rotatable leg (rotatable belt)
NOTE! Carefully check if you have a rotatable elevating belt or a movable elevating belt. The installation
of the wheels is different for each elevating belt.
Both legs (described in the former section) can be fitted with a wheel set, so that the elevating belt is rotatable.
Rotatable leg for a belt with the return unit in the manure pit (ZMMT014762-844) with accompanying
buttress set (ZMMT014762-832)
Rotatable leg for a belt entirely on the ground (ZMMT014762-839) with accompanying buttress set
(ZMMT014762-851)
The installation order of a leg with wheels is largely equal to the installation of a fixed leg.
Figure 6.7, Rotatable leg for elevating belt
1.
Upper part of the leg
2.
Lower part of the leg
3.
Cross profile
4.
Wheels
5.
Angle profile (also see figure 6.2.7)
6.
D-shackle
Mount the wheel set under the fixed leg as shown in section
6.2.1
and
1.
Assemble the leg including the wheels. Do not connect the lower part and the upper part yet. See
section 6.2.1.
2.
Position and mount the leg as described in section 6.2.1.
NOTE! Keep the extra height of the wheels in mind when adjusting the height of the leg.