17
b
Attach the hook cover plate. Check the threading by
referring to the diagram
r
shown on the hook cover
plate.
r
Threading diagram
c
Draw the thread to the left, sliding it between the
tension spring blades.
Inserting the bobbin
CAUTION:
Turn OFF the power switch before inserting the bobbin
and threading the bobbin holder.
z
Place a bobbin in the bobbin holder with the thread
running off counterclockwise.
q
End of thread
x
*XLGHWKHWKUHDGLQWRWKHÀUVWQRWFK
w
on the front
side of the bobbin holder.
w
Notch
v
Continue to draw the thread lightly until the thread
slips into the second notch
e
3XOORXWDERXWß
cm) of thread.
e
Notch
z
x
c
v
b
q
w
e
r
Содержание TS200Q
Страница 1: ...Instruction Book...
Страница 2: ......
Страница 61: ...59 Stitch Chart 02 02...
Страница 62: ...60 Stitch Chart MODE A 02...
Страница 63: ......
Страница 64: ...811 850 001 EN...