0-27
GO
-KARTS
B
U
MPERBOAT
S
Specifications subject to change without notice - Check our website for valuable information including videos, workshop and operations manuals. www.jjamusements.com
503-304-8899
ENDURANCE CL
UTCH PLA
TES
TM
BATTERY INSTALLATION (Electric only)
Open the boat top and use the wooden prop rod to hold the
top up.
‹ CAUTION › Place the wooden prop rod so it does not be-
come dislodged while holding the boat top in “up” position.
•
Remove items provided inside boat:
•
Wooden prop rod (qty 1)
•
Battery cables (qty 3)
•
Battery fill kit (qty 1)
•
Wiring schematic (qty 1)
•
Battery fill kit instructions
Batteries should be placed in such a position as to allow
ease of wiring. Place the batteries with terminals as shown
in Figure 1. Place battery #1 in the hull first, followed by
battery #4, #2, and finally, #3. This sequence helps keep the
boat balanced during battery installation.
Fig. 1
+
Battery 2
Battery 4
-
-
-
-
+
+
+
‹ CAUTION › Proper lifting procedures must be followed.
Carefully place batteries in the battery trays located inside
the bottom hull.
NOTICE J&J recommends using a battery carrier
(J&J #2-60-0034) when installing/moving heavy batteries.
Battery 1
Battery 3
SAFELY REMOVE, LIFT, AND adjust HEAVY BATTERIES
WITH THIS BATTERY CARRIER, j&j # 2-60-0034
Содержание Bumper Boat 2014
Страница 6: ...0 6 NOTES ...
Страница 90: ...3 2 MOTOR COVER General Information 3 2 Motor Cover And Neoprene Protector 3 3 ...