IS275-17L
J&D Manufacturing • 6200 Hwy 12 • Eau Claire, WI 54701 • 1-800-998-2398 • www.jdmfg.com
Section I - Page 1/4
Section I
Hanging & Connecting Stainless Steel Lines
Section I
Hanging/Securing Suspending Rod to Structure
Using a 3/8” drill bit and drill prepare a hole for the insertion of the mounting rod (VHPR160). Remove the nylock nut from the end of the mounting rod you will
be inserting, adjust the remaining flanged nut to allow enough of the mounting rod to protrude through hole to fully engage the nylock nut. Using a 1/2” wrench
and a 1/2” socket wrench, secure mounting rod by tightening both nuts.
3
If your system does not require the use of cable clamps, proceed to Step 3.
If your system does not require the use of suspended mounting rods, proceed to Step 5.
Hanging/Securing Line Using Cable Clamps
Insert the stainless steel line into the cable clamp and using the appropriate size and type of hardware (not provided) for your structure secure cable clamp to
structure.
2
Stainless Steel Line Hanging /Securing Requirements
Stainless steel lines require support at least every 8’.
NOTE: Mounting location and hardware (not included) must be able to withstand the weight of 11 lbs per 20’ of stainless steel line.
1
VHPR121
Cable Clamp
Stainless
Steel Line