Preparing 1” PVC Tubing 2’ Stick (VHPR151) for Assembly
Measure and mark the tube into (6) 4” sections.
Using the marks just made and a fine toothed saw cut tubing into sections.
Clean and deburr each end of cut tube.
Before Filter Tee Assembly
Following the PVC Gluing Guidelines in
Section E
, prime and glue a section of 4” tube, tee (SSOT), and another section of 4” tube as shown below.
After Filter Tee Assembly
Following the PVC Gluing Guidelines in
Section E
, prime and glue a section of 4” tube, tee (SSOT), and reducer bushing (VHPR146) as shown below.
Check and Ball Valve Assembly
Following the PVC Gluing Guidelines in
Section E
, prime and glue check valve (SS03), a section of 4” tube, and ball valve (SS01) as shown below.
IS275-17L
J&D Manufacturing • 6200 Hwy 12 • Eau Claire, WI 54701 • 1-800-998-2398 • www.jdmfg.com
Section F - Page 1/6
Section F
Filter System Assembly & Installation
Section F
4”
4”
4”
4”
4”
4”
4”
4”
4”
4”
4”
4”
4”
SS01
Ball Valve
Prime & Glue
Prime & Glue
SS03
Check Valve
Check and Ball Valve Assembly
SSOT
Tee
VHPR146
Reducer Bushing
Prime & Glue
4”
Prime & Glue
After Filter Tee Assembly
4”
Prime & Glue
4”
Prime & Glue
SSOT
Tee
Before Filter Tee Assembly
1
2
3
4
Pressure Gauge Assembly
Following the PTFE Tape & Tightening Guidelines in
Section E
, tape and assemble both pressure gauges (VHPR149) to a reducer (SS19) as shown below.
SS19
Reducer
VHPR149
Pressure Gauge
PTFE
Tape
Pressure Gauge Assembly
5
Arrow on valve indicates
water flow direction