It is the responsibility of the installer/owner to ascer-
tain compliance with specific local regulations prior to in-
stallation. Jacuzzi Europe S.p.A. gives no guarantee in
this respect and refuses all responsibility regarding com-
pliance of the installation carried out.
Technical Features
The Profile spa (
i
1;
i
2
) requires a total of about 1600 litres
of water. About 1300 go in the spa, and about 300 in the plumb-
ing circuit and in the compensation tanks (
i
2, detail T
).
Profile has 2 pumps for hydromassage of 2 Hp and 1 re-circu-
lation pump.
Profile is equipped with a "pressure" cartridge filter that ensures
excellent water filtering (filtering surface: 9.3 m
2
).
Profile Performance:
in this case, the filtering action is provid-
ed by a sand filter (provided separately, with a circulation pump
and a support base, see the corresponding installation manual).
Maximum absorption of the system
The electrical system that powers the spa
must
absolutely be
sized for maximum consumption (
as shown in the table
). If suf-
ficient electrical energy is not available, an electronic energy
consumption limiter can be activated.
- alternative consumption:
3.6 kW
(when 1 hydromassage pump
is run, the electric heater goes off)
.
Weights
User safety
I
The system, if installed by qualified personnel in compliance
with the provisions stated in part two of the enclosed manual, p-
resents no risks for the user. However, safety is also contingent
upon appropriate use, according to the provisions in part one,
while the user must assign the operations described in part two
to qualified personnel.
I
It is important to make sure that personnel tasked to install or
manage the system are qualified as per legal requirements in ef-
fect in the country where installation is carried out.
I
For any extra maintenance and/or repairs it is recommended
that you contact an authorized service centre. Use only original
spare parts.
Arrangement for installation
I
Profile requires the following plumbing connections (arranged
as in
i
1
):
-
B
: spa drainage.
-
B1
: overflow connection of the compensation tanks.
This con-
nection is to be made by perforating the base or the front of
the support base, depending on the type of installation.
-
B2
: compensation tanks drainage
.
ATTENTION: drain “B1” must always be left open.
The customer must make provisions for a ground drainage point
of suitable dimensions and that can be inspected for any clean-
ing that may be required.
ATTENTION: Before preparing the ground drainage
point, consult the local authority for the regula-
tions that control the drainage of chemically treat-
ed water.
I
Profile Performance:
connection must also be provided to the
drain for periodic backwash and possible emptying of the sand fil-
ter installed on the spa-pak, as well as electrical and plumbing con-
nection between the spa-pak and the spa
®
(see the corresponding
installation manual).
I
To restore the correct level of water in the compensation tanks
(for example, if it drops due to evaporation), you will need to sup-
ply water to the filling solenoid valve “EV” (
i
1, detail C
).
NOTE:
if the spa is installed outdoors, be sure to place a valve
on the pipe that supplies the solenoid valve and a drainage pipe
on the part of the pipe that is subject to freezing.
I
For periodic emptying of the spa and of the compensation
tanks, you can use two garden hoses to connect the drain valves
to the provided well:
- first remove the closure caps, screw in the connections (pro-
vided,
i
3, detail B/B2
) and connect the two garden hoses.
NOTE:
To open the valve, turn the ring nut counter-clockwise
and pull.
I
If you decide to connect drains B and B2 permanently to the
drain well, use one of the following solutions:
- eliminate the two discharge valve and directly connect the two
pipes (
i
3, detail B/B2
) located in the base, installing two
gate valves where they are most convenient to the user.
- if you do not intend to eliminate the gate valves, they must be
left open at all times, installing two gate valves down the line.
Please note that with this type of installation, it will take longer
to drain the spa.
Net weight
average fill
maximum
water volume
Total max.
weight
kg
litres
litres
kg
~ 400
~ 1600
~ 2110
~ 2510
support area
load concentrated
on support area
m
2
kg/m
2
~ 4,50
~ 558
50/60
Power supply
(x)
Volt
26
(k)
5,75
Hertz
Ampere
kW (j)
(k): 230V
(x): see "Electrical connections pre-arrangement”
audio system (optional): 250W
(j): absorbed power
Tot. Consumption: electric
filtering (k)
220-240 ~
2,5
(k)
0,5
(j)
Ampere
kW
Spa-Pak
(optional)
Содержание Profile
Страница 2: ......
Страница 3: ...Italiano 10 English 13 Fran ais 16 Deutsch 19 Espa ol 22 25 Profile Index...
Страница 5: ...5 T T T 2 i...
Страница 6: ...6 6 cm 74 cm B B2 B B2 3 4 1 2 3 1 2 3 i...
Страница 8: ...8 OK A A A A 12 cm A 6 i Profile synthetic wood 5 i...
Страница 9: ...9 20 mm 7 i 2 2 4 4 5 5 1 3 3 8 i...