22
NEW DAILY
–
DAILY CNG AND CNG WITH "RECOVERY MODE"
DAILY CNG AND CNG WITH "RECOVERY MODE"
B.5
FUSES AND RELAYS
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
117715
Figure 22
●
Unscrew the nuts
(5)
and remove the cover
(4)
.
●
Disconnect the electrical connection
(1)
from the coil
(2)
of the VBE solenoid valve.
●
Disconnect the gas pipes
(3)
from the solenoid valve
(2)
.
●
Hold up the cylinder
(6)
with suitable support
(9)
.
●
Remove the screws
(7)
, turn the brackets
(8)
and remove the cylinder
(6)
from the chassis.
●
Remove the VBE valves
(2)
from the cylinder
(6)
as described in the corresponding chapter.
Refitting
To refit, carry out the removal operations in reverse order, observing the following instructions:
●
Place the cylinders in the framework with the VBE valves pointing in the right direction to allow connecting the pipes;.
●
tighten the VBE valves
(2)
and the pipe unions to the prescribed torque, observing the instructions given in the paragraph
”Repairs on pipes and fittings (
●
Once refitting is completed, perform the hydraulic sealing test for leaks as indicated in the warnings at the beginning of
Chapter B.3 (
B.5
FUSES AND RELAYS
Fuse and relay box under the CNG dashboard
See Chapter 5.4 .
B.6
CONNECTORS FOR BODY BUILDERS
Note
For information about connectors for body builders, refer to the descriptions in Section 5 - Chapter 5.2 .
Содержание NEW DAILY
Страница 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Страница 4: ...Printed 603 95 789 Base 02 2014...
Страница 6: ...Printed 603 95 789 Base 02 2014...
Страница 8: ...Printed 603 95 789 Base 02 2014...
Страница 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Страница 10: ...Printed 603 95 789 Base 02 2014...
Страница 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Страница 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Страница 26: ...Printed 603 95 789 Base 02 2014...
Страница 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Страница 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Страница 88: ...Printed 603 95 789 Base 02 2014...
Страница 120: ...34 NEW DAILY APPLICATIONS OF SUPERSTRUCTURES APPLICATIONS OF SUPERSTRUCTURES Printed 603 95 789 1 Ed Base 02 2014...
Страница 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Страница 122: ...Printed 603 95 789 Base 02 2014...
Страница 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Страница 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Страница 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Страница 138: ...Printed 603 95 789 Base 02 2014...
Страница 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Страница 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Страница 190: ...Printed 603 95 789 Base 02 2014...
Страница 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Страница 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Страница 202: ...Printed 603 95 789 Base 02 2014...
Страница 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Страница 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Страница 218: ...Printed 603 95 789 Base 02 2014...
Страница 240: ...Printed 603 95 789 Base 02 2014...