NEW DAILY
–
ELECTRONIC SUB-SYSTEMS
ELECTRONIC SUB-SYSTEMS
5.4
ELECTRICAL SYSTEM: CURRENT INTERVENTIONS AND DRAWS
33
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
Drawing current
Information about the points where you can take samples of available current and directions to be followed are below.
209809
Figure 30
1.
CBA2
2.
Cable path between cab and engine compartment
3.
Body builders Connector (inside cab)
Current sample from the CBA2 control unit in the engine compartment
There are two fuses (FF and FG) installed in CBA2, reserved for the body builders; the terminals
(HI)
and
(MI)
downstream of
these fuses are the only two points reserved and authorised for sampling currents.
209810
Figure 31
HI.
Current take off point protected by Body builders fuse FF
MI.
Current take off point protected by Body builders fuse FG
The fuses for body builders supplied with the original equipment have a capacity of 30 A each.
If necessary they can be replaced with ones of a higher load respecting the indication of a maximum total withdrawal (sum of the
two fuses) equal to 130 A.
Содержание NEW DAILY
Страница 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Страница 4: ...Printed 603 95 789 Base 02 2014...
Страница 6: ...Printed 603 95 789 Base 02 2014...
Страница 8: ...Printed 603 95 789 Base 02 2014...
Страница 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Страница 10: ...Printed 603 95 789 Base 02 2014...
Страница 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Страница 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Страница 26: ...Printed 603 95 789 Base 02 2014...
Страница 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Страница 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Страница 88: ...Printed 603 95 789 Base 02 2014...
Страница 120: ...34 NEW DAILY APPLICATIONS OF SUPERSTRUCTURES APPLICATIONS OF SUPERSTRUCTURES Printed 603 95 789 1 Ed Base 02 2014...
Страница 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Страница 122: ...Printed 603 95 789 Base 02 2014...
Страница 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Страница 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Страница 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Страница 138: ...Printed 603 95 789 Base 02 2014...
Страница 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Страница 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Страница 190: ...Printed 603 95 789 Base 02 2014...
Страница 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Страница 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Страница 202: ...Printed 603 95 789 Base 02 2014...
Страница 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Страница 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Страница 218: ...Printed 603 95 789 Base 02 2014...
Страница 240: ...Printed 603 95 789 Base 02 2014...