48
NEW DAILY
–
ELECTRONIC SUB-SYSTEMS
ELECTRONIC SUB-SYSTEMS
5.4
ELECTRICAL SYSTEM: CURRENT INTERVENTIONS AND DRAWS
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
Dashboard emergency command (opt)
The
Emergency Switch
command consists of two switches on the central dashboard (see. Figure 42).
209817
Figure 42
1.
OFF button
2.
ON button
Pressing the OFF button
(1)
causes the following vehicle responses:
●
the engine switches off;
●
the turn indicators turn on;
●
the circuit breaker on the battery (CBA1) is activated and disables the secondary loads;
●
the locks unlock and the out swinging door opens (if IVECO original);
●
the ceiling lights stay on;
●
the parking lights turn off and all loads are disabled.
To reset the original vehicle conditions:
●
press the ON button
(2)
;
●
restart the vehicle.
External hazard command
In some cases the indicator lights are requested to turn on while the configured system is in operation.
This function can be managed by providing a negative unstable signal (using a button) to terminal 8 of connector H of the Body
Computer (see Figure 43).
Содержание NEW DAILY
Страница 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Страница 4: ...Printed 603 95 789 Base 02 2014...
Страница 6: ...Printed 603 95 789 Base 02 2014...
Страница 8: ...Printed 603 95 789 Base 02 2014...
Страница 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Страница 10: ...Printed 603 95 789 Base 02 2014...
Страница 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Страница 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Страница 26: ...Printed 603 95 789 Base 02 2014...
Страница 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Страница 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Страница 88: ...Printed 603 95 789 Base 02 2014...
Страница 120: ...34 NEW DAILY APPLICATIONS OF SUPERSTRUCTURES APPLICATIONS OF SUPERSTRUCTURES Printed 603 95 789 1 Ed Base 02 2014...
Страница 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Страница 122: ...Printed 603 95 789 Base 02 2014...
Страница 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Страница 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Страница 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Страница 138: ...Printed 603 95 789 Base 02 2014...
Страница 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Страница 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Страница 190: ...Printed 603 95 789 Base 02 2014...
Страница 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Страница 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Страница 202: ...Printed 603 95 789 Base 02 2014...
Страница 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Страница 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Страница 218: ...Printed 603 95 789 Base 02 2014...
Страница 240: ...Printed 603 95 789 Base 02 2014...