
2-42
CHASSIS MODIFICATIONS
D
AILY
Base — 02/2012
Printed 603.95.241
Operations on sheet metal
2.13.2
Operations on the cab
Change operations for the creation of specific versions must be carried out very carefully in order to protect the resistance and
maintain the functionality and protection of the cab.
When applying units or equipment on the roof panel (e.g. air conditioning systems, spoiler) check that the weight of the equipment
does not exceed the permitted weight for the cab. The required limits may be provided upon request, based on the version.
If an opening must be made, the following is necessary:
-
foresee union radiuses no smaller than 50 mm;
-
do not change any ribs that may be present;
-
do not alter the curvature of the roof.
Installation of a spoiler or a baggage compartment
Upon request, versions created by IVECO based on its own designs and checks are available.
If installing ”kits” of another origin, comply with the specific indications provided by the manufacturer.
If foreseen by national standards, these installations must be checked by the responsible approval bodies.
Operations on the roof panel and the rear wall of the cab
If it is necessary to remove the rear wall and partially the roof panel (e.g. caravan versions), the following instructions must be
observed:
-
make the cut as shown in Figure 2.19, being careful to comply with the minimum union radiuses;
-
eliminate the structure relative to the rear cross member on the roof panel level;
-
create a structure able to guarantee that the pillars will not be deformed to maintain the efficiency of the upper safety belt
connections;
-
for this structure, foresee resistance at a compression of at least 800 daN;
-
create the connection with the new structure following the general instructions provided above.
Содержание DAILY M.Y. 2012
Страница 1: ...DAILY M Y 2012 BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2012 ...
Страница 4: ...Base 02 2012 Printed 603 95 241 Update data ...
Страница 8: ...Index of section Base 02 2012 Printed 603 95 241 ...
Страница 10: ...1 2 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 26: ...1 18 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Convention ...
Страница 30: ...2 4 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 98: ...2 72 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Chocks ...
Страница 140: ...4 2 POWER TAKE OFFS DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 156: ...5 2 SPECIAL INSTRUCTIONS FOR ELECTRONIC SUBSYSTEMS DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 214: ...A 2 APPENDIX A DAILY PASSENGER TRANSPORT DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 230: ...B 2 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 252: ...B 24 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE DAILY Base 02 2012 Printed 603 95 241 Power Take Off ...