B-6
APPENDIX B - DAILY CNG AND CNG WITH RECOVERY MODE
D
AILY
Base - 02/2012
Printed 603.95.241
Operations on the system
B.3.3
Tightening torques
PART
TORQUE
Nm
kgm
Methane gas system
High-pressure hose connection (M12x1) to refuelling filler (Italy) - Figure B.2
24
÷
26
2.4
÷
2.6
High-pressure hose connection (M12x1) to refuelling filler (CEE) - Figure B.2
33
÷
37
3.3
÷
3.7
High-pressure hose connection (M12x1) to VBE 498 solenoid check valve - Figure B.2
33
÷
37
3.3
÷
3.7
High-pressure hose fittings - Figure B.3
38
÷
42
3.8
÷
4.2
Medium-pressure hose connection (M18x1.5) to pressure reducer Figure B.1
67
÷
73
6.7
÷
7.3
Medium-pressure hose connection (M18x1.5) to fitting on cylinder head Figure B.1
67
÷
73
6.7
÷
7.3
Stainless steel stiff pipe connection (M12x1) to pressure reducer
33
÷
37
3.3
÷
3.7
Stainless steel stiff pipe connection (M12x1) to VBE solenoid valve (side opposite check valve)
24
÷
26
2.4
÷
2.6
Stainless steel stiff pipe connection (M12x1) to VBE solenoid valves
24
÷
26
2.4
÷
2.6
Blank plug (M12x1) on solenoid valve
33
÷
37
3.3
÷
3.7
Fittings (M14x1.5) connecting pipe to T fittings and cross-fittings - Figures: B.4 - B.5 - B.6
74
÷
82
7.4
÷
8.2
Fittings (M 14x1.5) fastening cross fitting to chassis
67
÷
70
6.7
÷
7.0
Refuelling filler fastening to support (M24x1)
60
÷
70
6.0
÷
7.0
Solenoid valve fastening to cylinders (W28.8x1/14”)
260
÷
280
26.0
÷
28.0
Cylinder support bracket and rear crossmember fastening (M14x2)
151
÷
184
15.1
÷
1.84
Cylinder support strip fastening (M10x1.5)
33
÷
35
3.3
÷
3.5
Bracket fastening to cylinder support rear crossmember (M12x1.75)
74
÷
90
7.4
÷
9.0
Cylinder support rear crossmember fastening (M10x1.5)
42
÷
51
4.2
÷
5.1
Cylinder shelf fastening (M8x1.25)
21
÷
26
2.1
÷
2.6
The tightening torques indicated only refer to special original equipment components.
NOTE
Содержание DAILY M.Y. 2012
Страница 1: ...DAILY M Y 2012 BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2012 ...
Страница 4: ...Base 02 2012 Printed 603 95 241 Update data ...
Страница 8: ...Index of section Base 02 2012 Printed 603 95 241 ...
Страница 10: ...1 2 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 26: ...1 18 GENERAL SPECIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Convention ...
Страница 30: ...2 4 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 98: ...2 72 CHASSIS MODIFICATIONS DAILY Base 02 2012 Printed 603 95 241 Chocks ...
Страница 140: ...4 2 POWER TAKE OFFS DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 156: ...5 2 SPECIAL INSTRUCTIONS FOR ELECTRONIC SUBSYSTEMS DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 214: ...A 2 APPENDIX A DAILY PASSENGER TRANSPORT DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 230: ...B 2 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE DAILY Base 02 2012 Printed 603 95 241 Index ...
Страница 252: ...B 24 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE DAILY Base 02 2012 Printed 603 95 241 Power Take Off ...