1.
Clean all the areas of the baseplate that will come into contact with the grout.
2.
Build a dam around the foundation.
3.
Thoroughly wet the foundation that will come into contact with the grout.
4.
Pour grout through the grout hole into the baseplate up to the level of the dam.
When you pour the grout, remove air bubbles from it by using one of these methods:
•
Puddle with a vibrator.
•
Pump the grout into place.
5.
Allow the grout to set.
1
7
6
2
3
4
5
Item Description
1.
Baseplate
2.
Shims or wedges
3.
Grout
4.
Foundation
5.
Sleeve
6.
Dam
7.
Bolt
Figure 12: Pour grout into baseplate
6.
Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48 hours.
1
5
4
2
3
Item Description
1.
Baseplate
2.
Grout
3.
Foundation
4.
Dam
5.
Bolt
Figure 13: Fill remainder of baseplate with grout
7.
Tighten the foundation bolts.
8.
Recheck the alignment.
4.4 Grout the baseplate
30
Model 3355 Installation, Operation, and Maintenance Manual
Содержание Goulds Pump 3355
Страница 1: ...Installation Operation and Maintenance Manual Model 3355 ...
Страница 2: ......