WARNING!
Risk of injury due to pressure safety valve!
–
The pressure safety valve is under pressure, do not touch.
–
The pressure safety valves are configured and may not be
changed.
–
Ensure that the factory setting of the pressure safety valve com-
plies with the requirements of the pump.
It is possible that the centre height of the drive shaft may change as
a result of heating up. In this case, the pump unit must be realigned
Chapter 5.5 ‘Aligning the pump unit’ on page 32).
1.
Lay connections and install heating/cooling in the properly manner (
manufacturer's instructions).
2.
Check technical data for the heating/cooling medium (
job data sheet).
3.
Bleed heating/cooling.
4.
For heating/cooling, ensure:
n
Required parameters (
system documentation, pump data sheet,
dimensional drawing)
n
Temperature difference between heating medium and conveyed
medium less than 50 °C
n
Switch on pump heating at least 2 h before commissioning.
1.
Ascertain the appropriate oil lubrication system (
pump data sheet).
2.
Install oil lubrication system (
manufacturer's specifications, pump
system operating instructions).
3.
Ensure necessary operating parameters (
manufacturer's instructions).
6.1.6 Inertisation (for ATEX)
DANGER!
Mortal danger due to explosion!
Observe the additional ATEX instructions!
For ATEX, make sure that suitable equipment (including inertisation
connections, gas measuring device, inert gas) for the inertisation of
the pump and pipelines is available and ready for use.
Pressure safety valve
Heating/cooling of the casing (optional)
Oil lubrication system
Operation
Type SLH-4G, SLHS-4G
49
01/2016 JPB Rev. 5