Rea® Dahlia® 30 / 45
2.22.5 Electrical schedule
A
A
B
C
D
E
F
G
C
D
H
A
Hand control
B
Battery
C
Seat tilt actuator
D
Backrest recline actuator
E
Mains cable
F
Control box
G
Cable lock actuators
H
Cable lock battery cable
CAUTION!
Risk of malfunction
The system may not work properly
– Connect all functions before connecting the mains cable.
– Connect the hand control first. The connection at the control box is marked with “HB”.
– Connect the different actuators according to the schedule above.
– Check that all plugs are well connected and firmly pushed into the connection plug.
– Check that the cable locks are engaged in order for the cables to be secured in the control box.
– Connect the battery.
– Connect the mains cable and turn on the power.
– Control boxes must only be connected to the mains voltage specified on the label. See chapter “Electrical
system” for more information.
– Make sure that the cables are not trapped, tensed or exposed to sharp objects when using the system.
20
1572308-G
Содержание REA Dahlia 30
Страница 51: ...Notes...