3 SET UP THE SPLICING SYSTEM
Belt Splicing System v.2.0
3-3
2.
Insert the tethered retaining pin into the hole
on the shaft to secure the Handle in place.
FABRICATION TIP
Ensure the tether and fastener face outward.
NOTE
If there are any concerns about adequate Fixture
Prepare the Heat Wand
Make Power Connections
1.
Place the Heat Wand in the Stand and latch
in place.
Figure 3D: Latch Heat Wand in Stand
2.
Ensure the equipment voltage requirements
match the available facility power voltage. If
voltage does not match, see
Figure 3E: Check voltage requirements
3.
Connect the Wand Cord to the Heat Wand,
then to the Temperature Control Box. Latch
connections together.
NOTE
Each Wand Cord connection fits into
only one component.
Do not force connections together.
Содержание ThermoDrive
Страница 5: ...SAFETY 4 Belt Splicing System v 2 0 Figure B Clamping Fixture hazards...
Страница 19: ...STANDARD PROCEDURES STANDARD PROCEDURES...
Страница 44: ...TROUBLESHOOTING TROUBLESHOOTING...
Страница 61: ...SPECIAL PROCEDURES SPECIAL PROCEDURES...
Страница 76: ...PREVENTIVE MAINTENANCE PREVENTIVE MAINTENANCE...