NSN 6130-99-391-3441 ()
Battery Charger Analyser : Operator Manual
3
Battery Charger Analyser Overview
3.1
Battery Room Specifics
This manual deals only with the scope of use of the equipment and does not cover battery
room specifics such as handling, filling, fume extraction etc. These items will be covered in
other relevant documentation.
For all methods of use of the battery charger the battery to be tested or charged must
only be connected when the charger is either:
a) Not powered up, or
b) Powered up and not executing a charge or test function.
The battery
SHOULD NEVER BE CONNECTED OR DISCONNECTED
from the
when a charge or test is in progress. Doing so would damage the equipment,
and possible draw an electrical arc that, may cause an explosion from the venting gases
being emitted from the battery. Care must also be executed in ensuring that the bared
ends of the battery leads do not come in contact with the metalwork of the charger as this
may also cause electrical arcing and or explosion risk.
3.2
General Operation
When power is applied to the , it will perform some internal self-tests and the
following display will be shown:
* * * *
T S 1 3 4 0 +
* * * * *
I s s u e
2 1 7 . 0 2 . 2 0 0 3
P e r f o r m i n g S e l f T e s t . . P l e a s e W a i t .
Once internal test are complete, (this takes only two to three seconds) the following main
screen will be shown:
T S 1 3 4 0 + M A I N M E N U
7 - 0 5 - 2 0 0 1 1 6 : 3 0 : 1 5
P E R F O R M
C H A R G E / T E S T U S I N G N S N N U M B E R
Using the up and down arrow keys on the keypad the alternative functions can
be accessed. The function displays are as follows:
Press
T S 1 3 4 0 + M A I N M E N U
7 - 0 5 - 2 0 0 1 1 6 : 3 0 : 1 5
P R E V I E W
R E S U L T S O F L A S T C H A R G E O R T E S T
Doc: DWG1030-25-R11 Operators manual.odt
Page 6 of 72
Copyright Material of Intelligent Charging Limited © 2015
Printed On : 12/06/17