Intel
®
Server System SR2600UR/SR2625UR Service Guide
47
Installing the Front Bezel
The front bezel is optional. If your system includes the bezel for either the standard
control panel or Intel
®
Local Control Panel, follow these steps to install the front bezel.
Note:
Before installing the bezel, you must install the rack handles. For instructions, see
“Installing the Rack Handles” on page 137
.
To install the bezel, follow these steps:
1. At each end of the bezel, line up the center notch on the bezel with the center guide
on the rack handles.
2. Push the bezel onto the front of the server system until it clicks into place.
Figure 29. Installing the Front Bezel
TP02130
Содержание SR2600URLX
Страница 4: ...iv Intel Server System SR2600UR SR2625UR Service Guide...
Страница 8: ...viii Intel Server System SR2600UR SR2625UR Service Guide...
Страница 18: ...xviii Intel Server System SR2600UR SR2625UR Service Guide...
Страница 20: ...xx Intel Server System SR2600UR SR2625UR Service Guide...
Страница 26: ...6 Intel Server System SR2600UR SR2625UR Service Guide...
Страница 28: ...8 Intel Server System SR2600UR SR2625UR Service Guide Figure 2 Intel Server System SR2625UR AF002819...
Страница 88: ...68 Intel Server System SR2600UR SR2625UR Service Guide Figure 51 Removing the Fan Baffle AF003021 A B C...
Страница 170: ...152 Intel Server System SR2600UR SR2625UR Service Guide...
Страница 180: ...162 Intel Server System SR2600UR SR2625UR Service Guide...
Страница 204: ...186 Intel Server System SR2600UR SR2625UR Service Guide...
Страница 228: ...210 Intel Server System SR2600UR SR2625UR Service Guide...