
OnTime Clock
Installation and User Guide
Firmware Version 2
All claims based on information publicly available at time of printing. All other product or service names mentioned
in this document may be trademarks of the companies with which they are associated.
© 2017 Inova Solutions | All rights reserved | page 16
4.10. Power Up and Verification
Once the installation is complete, power up the units by connecting them to a PoE
enabled Ethernet LAN. The clocks will follow the power up sequence described in
Figure 12.
Note that the center column includes two possible scenarios where the power up
sequence could stall for the clock.
Figure 12: Power Up Sequence