
14
INSTALLATION
2.7 Condensate drain
The unit is complete of a drain pan that collects the con-
densate fluid that is produced during cooling operation and
must be conveyed to a suitable place for unloading.
1.
drain connection, external Ø 14 mm
A
Connection to the condensate drain
A
Drain connection
B
Drainage tube
A
B
– connect a rubber drainage tube
– direct it to a suitable place for dropping
A
Unit
B
Liquid drain pipe
B
A
– provide a slope never less than 1%
– insulate fitting points
Pay attention to the tilt of the condensate drain pipe.
Make the condensate liquid flow directly onto a gutter or
into a "white water" drain
Make a siphon to prevent bad smells returning up the
pipe towards the room. The curve of the siphon must be
lower than the condensation collection pan.
Install a pump if the drain pipe is higher than lower level
of pan.
Choose carefully the destination of the drain considering
the rise of odors in case of siphon drying.
Check
After the installation is completed:
– pour the water very slowly into the condensate drain pan
– check the right outflow
Содержание Innova Filomuro Incasso SLWI
Страница 1: ...EN Installation and user manual SLWI...