Installation / Assembly
T-Rack
®
3.0 Series
– Assembly Instructions 1.1(2019-03) E inge
Page 61 of 84
© inge GmbH
5.13
Tightly screwing together the Channel Sections (DIN 1026)
Step
Activity
Figure
1
Secure the modules
a)
Before screwing the modules tight, check that they are at
right angles to each other and correct this if necessary.
b)
Fasten all 12 modules of both rows with the channel
sections (DIN 1026), using a torque key (size 17) and a
torque of 5 Nm.
c)
Fasten the channel sections (DIN 1026) to the mounting
clamp PE between modules 1 and 3 and modules 11 and
12 using a torque key (size 17) and a torque of 5 Nm.