Installation / Assembly
T-Rack
®
3.0 Series
– Assembly Instructions 1.1(2019-03) E inge
Page 42 of 84
© inge GmbH
Step
Activity
Figure
3
Mount the channel section (DIN 1026)
(U profile 50 x 38)
a)
Remove the upper hexagon nuts (DIN 934) M16 and one
of the two washers (DIN 433) A17 from each of the frame
feet.
b)
Place the channel section (DIN 1026) (profile opening
facing up) on two frame feet.
c)
Repeat procedure a) and b) for two further U profiles and
four further frame feet.
4
Mount the channel section (U profiles 50 x 50 x 4)
a)
Place the three channel sections (DIN 1026) at distances
that correspond to the holes of the channel section.
b)
Position the two channel sections with the openings facing
each other, in a position that is aligned with the protruding
bolts of the channel section (DIN 1026).
5
Hand-tighten the bottom frame
a)
Place the washers (DIN 433) A17 over the protruding bolts.
b)
Then screw on the hexagon nut (DIN 934) M16 by several
turns.
c)
Repeat the procedure a) to b) for all protruding bolts.
d)
Hand-tighten the U profiles onto the frame feet at all
positions.
6
Insert the channel sections (DIN 1026) (U profiles 50 x
38 mm with four holes) in the channel section
The described example configuration (12 modules, two rows)
has 6 installed connecting braces.
In other configurations, this number can vary from 2 to 5 braces.
a)
Insert the channel sections (DIN 1026) (profile opening
facing down) into the U profiles of the channel sections
parallel to the channel sections (DIN 1026).
b)
Distribute the channel sections (DIN 1026) along the frame
length so that three are positioned in each half of the
frame.
The exact alignment will be made in a later step.