42
Double Sided Timing Belt and Drive Pulleys
a) Removal
•
Disconnect
the
power cord
from the machine.
1. Remove the
conveyor pulley
,
motor belt
and the
gears
. (See Section 2.2)
2. Remove the
double sided belt
.
a) Loosen the
idler tension bracket
and slide the bracket and pulley down to release tension on the belt.
b) Remove the
idler pulley
from the bracket.
Note:
The
pulley
uses a double screw attachment and both sides must be held to unscrew the screws.
3. Remove the
roll pulleys
.
a) Loosen the set screws and remove the
pulleys
.
4. Remove the
belt.
b) Installation
1. Installation is the reverse of removal.
2. Adjust belt tension. (See Section 2)
Содержание 7K Plus
Страница 2: ...ii...
Страница 31: ...31 11 Appendix Side Frame Assembly Drawings...
Страница 33: ...33 7KPlus Exploded Drive Train...
Страница 34: ...34 10 Amp IEC Bracket Assy IEC Outlet...
Страница 35: ...35 NOTE Torque Limiter 26 0316 00 includes items 1 2 5 6 and 7 see page 10 Clutch Assembly Door Safety Switch...
Страница 36: ...36 Retard Assembly...
Страница 37: ...37 7KPlus Schematic...
Страница 38: ...38...
Страница 51: ...51...
Страница 52: ...52 Phone 866 427 4546 Fax 603 332 8043 www brilininc com...