Installation
4-7
jinb
80
e1
-h
Op
er
at
in
g
M
anua
l
(1
50
1)
Ventilation
Usually the parts under test are vented with ambient air after the test has been
finished. If it is required, the parts can be vented with an different gas type (i. e. fresh
air, dry air, nitrogen, …) at a pressure of max. 1050 mbar. In these cases, the gas
supply has to be connected to flood connection (8 mm hose connection) on the left
side of the device. The gas pressure on the flood connection may not exceed
1100 mbar (absolute).
It is also possible to connect an additional external ventilating valve to the valve
output V21.
Sniffer line
The connection for the sniffer line exists only for the sniffer version of the Modul1000
(catalogue number 550-310). This connection is for the optional sniffer line SL200.
The SL200 is connected to the power system via the connector socket ACCESSO-
RIES.
Fig. 4-4 Installation of metering orifice
Содержание 550-300A
Страница 6: ...1 4 Content jinb80e1 h Operating Manual 1501 ...
Страница 10: ...1 8 Operating instructions jinb80e1 h Operating Manual 1501 ...
Страница 18: ...2 8 Important safety instructions jinb80e1 h Operating Manual 1501 ...
Страница 26: ...3 8 Description of equipment jinb80e1 h Operating Manual 1501 ...
Страница 111: ...Technical Data 9 23 jinb80e1 h Operating Manual 1501 9 7 Commander mode Fig 9 14 Flow Chart ...
Страница 112: ...9 24 Technical Data jinb80e1 h Operating Manual 1501 9 8 CE Certificate Fig 9 15 ...
Страница 122: ...10 10 Error Messages and Warnings jinb80e1 h Operating Manual 1501 ...
Страница 124: ...11 2 Ordering Information jinb80e1 h Operating Manual 1501 ...