Transportation, Installation, Commissioning
LL1602.10043 - 04.08.2014
ABC
PREPARATIONS
Power supply
Keep the cables for mains supply to the machine as short as
possible. Cable cross section must be adequate.
Power supply for the PLC and for the NC must be stable, i.e. the voltage fluctua-
tion must not 10% - 10%.
The cables must comply with the regulations of the local electricity suppliers and
the locally valid regulations.
For additional data see chapter "Working Data".
Compressed Air Supply
Be aware of the max. permissible pressure for the machine.
See pneumatic diagram in the chapter "Working Data".
Machines with elements operating with compressed air require compressed air sup-
ply with the following capacity:
Working pressure.....................................6 to 10 bar
Consumption ............................................according to machine equipment
For compressed air feed into the machine, see machine installation diagram in the
chapter "Working Data".
Main fuse
Check if the service line can be loaded with an extra value that
requires fusing.
In case of doubt have the situation clarified by the local elec-
tricity provider.
The main fuse is not provided with the machine delivery. According to the regula-
tions DIN EN 60204-1 this must be installed externally i.e. outside of the machine.
If a pre-transformer is required, the main fuse must be installed ahead of the pre-
transformer i.e. in the primary circuit.
The fusing depends on the operating voltage.
For the values for
– mains connection,
– operating voltage,
– main fuse
see machine installation diagram in the chapter "Working Data".