16
Transportation, Installation, Commissioning
LL1602.10043 - 04.08.2014
ABC
QUICk START mANUAl fOR TRANSPORT ABC
INDEX-Werke GmbH & Co. KG
Hahn & Tessky
D-73726 Esslingen
Fax +49 (0)711 3191 - 587
E-Mail: [email protected]
Unloading the machine with a crane
min. 1700
ca. 1250
min. 1700
ca. 1250
Securing devices for Transport
Before start-up all securing devices for the transport must be removed. Shipping brackets are identi-
fied by their red color.
Siding guard
Turret 1 ( Z-axis)
Turret 2 ( Z-axis)
L1601.100 41_ 4
L1601.100 41_ 21
L1601.100 41_ 6
L1601.10041_15
L1601.10041_17/18
L1601.10041_19
1
2 2
3
Connec t the leakage oil-line from the chuck-
ing cylinder (1) to the oil tank (36mm A /F).
Unscrew the closing plug (2), and replace it
with the filling and airing filter (3).
Fig. 2
Transport of the machine by fork lift truck
L16 01.10 041_10