20
Transportation, Installation, Commissioning
LL1602.10043 - 04.08.2014
ABC
PREPARATIONS
Placing the machine
P1201.10051_21
Placing the machine
When the final installation site has been determined and prepared, the machine can
be directed there and put down carefully.
Placing the machine ...
...with a crane or a mobile crane
Lift the machine with the crane until it is suspended.
When you have moved the machine on casters to the installation site pull these
out from under the machine.
...with hydraulic jacks (Fig.)
Hydraulic jacks are required when the use of a crane is not possible at the installa-
tion site.
When lifting or lowering the machine with hydraulic jacks
make sure that a three-point bearing is provided for: Seat the
machine on the floor or on two Conveyor rolls on one side –
two hydraulic jacks on the other side.
Always jack up one narrow side of the machine. The other
narrow side must stand on the transportation means or on the
floor.
Never lift the machine higher than absolutely necessary.
As the centre of gravity does not lie in the middle of the ma-
chine the load bearing capacity of one jack should be at least
1/3 of the machine mass when using 2 hydraulic jacks.
When working with only one hydraulic jack its load bearing
capacity should be minimum 2/3 of the machine mass.
Lift the machine step by step and support the machine after
each step by packing suitable blocks of wood underneath.
Same applies for lowering.