Immergas VICTRIX MAIOR 35 X TT 1 ERP Скачать руководство пользователя страница 5

5

SI

NO

1-1

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

YES

NO

1

 BOILER  

INSTALLATION

1.1 INSTALLATION 

RECOMMENDATIONS.

The Victrix Maior 35 X TT 1 ErP boiler has been 

designed for wall mounted installation only, to 

heat and produce domestic hot water for domes-

tic use and similar purposes 

(when the boiler is 

connected to an external storage tank unit)

.

The place of installation of the appliance and 

relative Immergas accessories must have suitable 

features (technical and structural) such to allow 

(always in safety, efficiency and comfortable 

conditions):

-  installation (according to the provisions of the 

technical legislation and technical regulations);

-  maintenance operations (including scheduled, 

periodic, routine and special maintenance);

- removal (to outdoors in the place for loading 

and transporting the appliances and compo-

nents) as well as their eventual replacement 

with appliances and/or equivalent components.

The wall surface must be smooth, without any 

protrusions or recesses enabling access to the 

rear part. They are not designed to be installed 

on plinths or floors (Fig. 1-1).

By varying the type of installation the classifica-

tion of the boiler also varies, precisely:

Type B

23

 or B

53

 boiler if installed using the 

relevant terminal for air intake directly from 

the room in which the boiler has been installed.

Type C boiler

 if installed using concentric 

pipes or other types of pipes envisioned for 

sealed chamber boilers for air intake and expul-

sion of flue gas.

Note:

 appliance classification is provided in the 

depictions of the various installation solutions 

shown on the following pages.
Only professionally enabled companies are 

authorised to install Immergas gas appliances.

Installation must be carried out according to 

regulation standards, current legislation and in 

compliance with local technical regulations and 

the required technical procedures.

Attention: 

the manufacturer declines all liability 

for damages caused by boilers removed from 

other systems or for any non-conformities of 

such equipment.
Before installing the appliance, ensure that it is 

delivered in perfect condition; if in doubt, contact 

the supplier immediately. Packing materials (sta-

ples, nails, plastic bags, polystyrene foam, etc.) 

constitute a hazard and must be kept out of the 

reach of children. If the appliance is installed in-

side or between cabinets, ensure sufficient space 

for normal servicing; therefore it is advisable to 

leave clearance of at least 3 cm between the boiler 

casing and the vertical sides of the cabinet. Leave 

adequate space above the boiler for possible water 

and flue removal connections. Keep all flamma-

ble objects away from the appliance (paper, rags, 

plastic, polystyrene, etc.).

Do not place household appliances underneath 

the boiler as they could be damaged if the safety 

valve intervenes, if the drain trap is blocked, or 

if there are leaks from the hydraulic connec-

tions; otherwise, the manufacturer cannot be 

held responsible for any damage caused to the 

household appliances.

For the aforementioned reasons, we recommend 

not placing furnishings, furniture, etc. under 

the boiler. 

In the event of malfunctions, faults or incorrect 

operation, turn the appliance off and contact an 

authorised company (e.g. the Authorised Tech-

nical Assistance centre, which has specifically 

trained staff and original spare parts). Do not 

attempt to modify or repair the appliance alone.

Failure to comply with the above implies personal 

responsibility and invalidates the warranty.
• Installation regulations: 
  - this boiler can be installed outdoors in a 

partially protected area. A partially protected 

area is one in which the appliance is not 

exposed to the direct action of the weather 

(rain, snow, hail, etc..).

NOTE: 

this type of installation is only possible 

when permitted by the laws in force in the ap-

pliance’s country of destination.

  - Installation of gas appliances, flue exhaust 

pipes and combustion air intake pipes is 

forbidden in places with a fire risk (for ex-

ample: garages, closed parking stalls), and 

in potentially dangerous places.

  - Installation is prohibited on the vertical 

projection of cooking hobs.

  -  Installation is forbidden in places/rooms that 

constitute public areas of apartment build-

ings, internal stairways or other escape routes 

(e.g. floor landings, entrance halls, etc.).

  -  Installation is also forbidden in places/rooms 

that constitute public areas of apartment 

buildings such as cellars, entrance halls, at-

tics, lofts, etc., unless otherwise provided for 

by local regulations in force.

Attention:

 wall mounting of the boiler must 

guarantee stable and efficient support for the 

generator

The plugs (standard supply) are only to be used 

to fix the appliance to the wall;

 they only ensure 

adequate support if inserted correctly (according 

to technical standards) in walls made of solid or 

semi-hollow brick or block. In the case of walls 

made from hollow brick or block, partitions with 

limited static properties, or in any case walls 

other than those indicated, a static test must be 

carried out to ensure adequate support.

These boilers are used to heat water to below 

boiling temperature in atmospheric pressure.

They must be connected to a central heating 

system and hot water circuit suited to their 

performance and capacity.

Attention: 

The storage tank unit must also be 

installed in an environment in which the tem-

perature cannot fall below 0°C.

STD.002549/004

Содержание VICTRIX MAIOR 35 X TT 1 ERP

Страница 1: ...VICTRIX MAIOR 35 X TT 1 ERP IE Instruction and recommendation booklet 1 038660ENG STD 002549 004...

Страница 2: ...STD 002549 004...

Страница 3: ...ified in the regulations in force and principles of good practice In compliance with legislation in force the systems must be designed by qualified professionals within the dimensional limits establis...

Страница 4: ...ce 21 2 2 General warnings 21 2 3 Control panel 21 2 4 Using the boiler 22 2 5 Troubleshooting 22 2 6 Information menu 25 2 7 Boiler shutdown 25 2 8 Restore central heating system pressure 25 2 9 Syst...

Страница 5: ...removal connections Keep all flamma ble objects away from the appliance paper rags plastic polystyrene etc Do not place household appliances underneath the boiler as they could be damaged if the safet...

Страница 6: ...kept An aqueous solution must be made with potential pollution class of water 2 EN 1717 2002 or local regula tions in force Attention the excessive use of glycol could jeopardise the proper functioni...

Страница 7: ...ipes radiators etc with special pickling or descaling products to remove any deposits that could compromise correct boiler operation A treatment of the heating and water system water is required in co...

Страница 8: ...stats are connected with 2 wires only Carefully read the user and assembly instructions contained in the acces sory kit On Off Immergas digital chrono thermostat The chrono thermostat allows set two r...

Страница 9: ...ystem flow temperature to be automatically decreased when the external temperature increases in order to adjust the heat supplied to the system according to the change in external temperature The exte...

Страница 10: ...owed cor responds to the resistance encountered with the maximum allowed pipe length for each type of Terminal Kit This information allows calculations to be made to verify the possibility of setting...

Страница 11: ...nd Exhaust 16 3 m 2 5 Intake m 18 7 Exhaust m 4 9 m 7 7 Exhaust m 13 6 Concentric vertical intake exhaust terminal 60 100 Intake and Exhaust 9 m 1 4 Intake m 10 3 Exhaust m 2 7 m 4 3 Exhaust m 7 5 Pip...

Страница 12: ...the 2 previously removed screws Install the 80 outlet flange on the central hole of the boiler taking care to insert the gasket supplied with the kit and tighten by means of the screws provided Insta...

Страница 13: ...cular projections down wards in contact with the boiler flange and tighten using the screws present in the kit Fit the 60 100 3 concentric terminal pipe with the male side smooth to the female side of...

Страница 14: ...up to the end stop making sure that the wall sealing plate has been fitted 3 this will ensure sealing and joining of the elements making up the kit NOTE when the boiler is installed in areas where ve...

Страница 15: ...the flat flange present in the lateral hole with respect to the central one ac cording to needs and replace it with the flange 3 positioningthegasket 2 alreadypresentin the boiler and tighten using t...

Страница 16: ...a The dimensions of the shafts must ensure a minimum gap between the outer wall of the smoke duct and the inner wall of the shaft 30 mm for circular section shafts and 20 mm in the event of a square s...

Страница 17: ...uildings in 23 or B53 mode in this case all technical rules and national and local regulations in force must be complied with Type B open chamber boilers must not be installed in places where commerci...

Страница 18: ...ated water To prevent corrosion the water system s PH should be between 6 5 and 8 5 Check the maximum content of chlorides which should be less than 250 mg l N B for quantities and methods of use of w...

Страница 19: ...valve kits with or without inspection filter on request The boiler is designed for installation of system interception cocks to be placed on flow and return pipes of the connection assembly This kit i...

Страница 20: ...7 Manual air vent valve 8 Delivery probe 9 Ignition detection electrode 10 Flue probe 11 Sample points air A flue gas F 12 Burner cover 13 Safety flow probe 14 Condensation module 15 Fan 16 Return pr...

Страница 21: ...prohibited For safety purposes check that the concentric air intake flue exhaust terminal if fitted is not blocked If temporary shutdown of the boiler is required proceed as follows a drain the heati...

Страница 22: ...external probe present the relative symbol 18 will appear on the display In the central heating phase if the temperature of the water contained in the system is sufficient to heat the radiators the b...

Страница 23: ...er flame switches off unexpectedly a new attempt at ignition is performed and if normal conditions are restored the boiler does not have to be reset If normal conditions are restored the boiler restar...

Страница 24: ...e has been detected The boiler does not start 1 88 Block gas valve control A malfunction of one of the components that controls the gas valve has been detected The boiler does not start 1 89 Combustio...

Страница 25: ...ntly filling must be car ried out with suitably treated water to eliminate hardness that can cause lime scale 2 11 CASE CLEANING Use damp cloths and neutral detergent to clean the boiler casing Never...

Страница 26: ...eck that the intake and or exhaust terminals are not blocked ensure activation of all adjustment devices checktheproductionofDHW whentheboiler is connected to an external storage tank unit check seali...

Страница 27: ...or X5 is used for the connection to the relay board The connector X6 is for connection to a personal computer The connector X8 is used for software updating operations Key A19 Removable memory B1 Boil...

Страница 28: ...are within the set limits The factory set pressure values of the expansion vessel must be 1 0 bar the value of system pressure must be between 1 and 1 2 bar Noise due to air inside the condensation mo...

Страница 29: ...position Fig 3 5 and press the Reset button for about 8 seconds until the chimney sweep function is activated then press the summer winter button within 3 seconds Nominalheatoutput with the function...

Страница 30: ...is activated then press the info button within 3 seconds Once the function is active the boiler sequential ly carries out the procedures required to calibrate the appliance with the nominal intermedia...

Страница 31: ...E62 will appear and complete calibration will be required Menu G This menu is reserved for the air gas control settings and it features two sub menus n and S relating to fan and gas valve control set...

Страница 32: ...neral alarm 2 CH phase active 3 External gas valve power supply 4 Secondary zone control from TA on relay P C B contact 5 Heat pump 6 Do not use on this boiler model 7 Do not use on this boiler model...

Страница 33: ...On 5 C Off 0 C 2 t3 Not used on this boiler model t4 Not used on this boiler model t5 Central heating ignitions timer The boiler has electronic timing which prevents the burner from igniting too ofte...

Страница 34: ...heck power supply Incaseoffunctioningindomestichotwa Id Parameter Parameter Description Range Default Customised value F0 Equivalent length flue Defines the length of the flue see par 3 12 0 2 0 F1 No...

Страница 35: ...integrityoftheelectri cal system and in particular supply voltage cables must be inside the fairleads there must be no traces of blackening or burning Check ignition and operation Check correct calibr...

Страница 36: ...a 2 Press the hooks inwards which block the lower grid b 3 remove the grid b Front panel Fig 3 15b 4 Open the protection door e1 pulling it towards you 5 Remove the cover caps c and loosen screws d 6...

Страница 37: ...USER MAINTENANCE TECHNICIAN Ref X Control panel Fig 3 15d 9 Press the hooks on the side of the control panel i 10 Tilt the control panel i towards you Sides Fig 3 15e 11 Loosen screws k of side faste...

Страница 38: ...URNER GAS FLOW RATE BURNER GAS FLOW RATE kW kcal h m3 h kg h 34 2 29412 99 3 70 2 71 33 5 28810 97 3 62 2 66 32 5 27950 94 3 51 2 58 31 5 27090 91 3 40 2 50 30 5 26230 88 3 29 2 42 29 5 25370 85 3 19...

Страница 39: ...80 60 C 0 24 0 10 Heat loss at flue with burner On Off 80 60 C 0 01 2 00 Central heating circuit max operating pressure bar 3 0 Maximum heating temperature C 90 Adjustable heating temperature max oper...

Страница 40: ...l Number CHK Check Cod PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum DHW heat input Qn min CH minimum heat input Qnw max DHW maximum heat input Qn max CH maximum heat input Pn...

Страница 41: ...1 kW At partial load elmin 0 012 kW Ignition burner energy consumption Pign 0 000 kW In standby mode PSB 0 004 kW Emissions of nitrogen oxides NOX 24 mg kWh For mixed central heating appliances Stated...

Страница 42: ...ementary heat pump From fiche of heat pump Solar contribution and Supplementary heat pump Select smaller value Boiler and supplementary heat pump installed with low temperature heat emitters at 35 C F...

Страница 43: ...energy efficiency of the package of products provided far in this fiche may not correspond to its actual energy efficiency once installed in a building as the efficiency is influenced by further facto...

Страница 44: ...ution From fiche of solar device 1 I 2 1 1 x I 10 x II III I Auxiliary electricity 3 G F E D C B A A A A 27 27 27 28 27 27 27 28 30 30 30 32 33 34 35 36 36 37 38 40 39 50 55 60 65 75 80 85 100 115 123...

Страница 45: ...nder colder and warmer climate conditions Colder 0 2 x Warmer 0 4 x Declared load profile Solar contribution From fiche of solar device 1 ___ 2 1 1 x ___ 10 x ____ ____ ____ Auxiliary electricity 3 G...

Страница 46: ...46 STD 002549 004...

Страница 47: ...47 STD 002549 004...

Страница 48: ...S p A 42041 Brescello RE Italy Tel 0522 689011 Fax 0522 680617 Certified company ISO 9001 This instruction booklet is made of ecological paper Cod 1 038660ENG rev ST 001863 004 08 18 Inglese per IRLA...

Отзывы: